TX FW LGA 10(5) Steve Thompson Wildlife Drive
- Response deadline
- Sep 17, 2026 Due in 15 days
- Date posted
- Sep 1, 2026
- Source
- Open notice
Description
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILBLE PROJECT NUMBER: TX FW LGA 10(5) PROJECT NAME: STEVE THOMPSON WILDLIFE DRIVE PROJECT DESCRIPTION: The proposed project includes full depth reclamation of existing driving surface which includes chip seal material, and existing gravel. After completing full-depth reclamation new aggregate surface course will be added to create a driving surface that has a consistent width. The project also includes installation of aluminum gate and a small concrete pad and safety improvement signs and speed bumps. The project includes three alternate bid items for Aggregate Surface Course (TON) with one being awarded. Alternate 1: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area. Alternate 2: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive. Alternate 3: 3-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area. PRINCIPAL WORK ITEMS: The project includes the following work items: Full Depth Reclamation (MILE) – 13 MILE Aggregate Surface Course (TON) – 11,000 TON ANTICIPATED SCHEDULE: The anticipated advertisement date is September 2026 with construction beginning in January 2027, and project completion in August 2027. ORDER OF MAGNITUDE: The proposed project cost ranges between $2,000,000 and $5,000,000.
Classifications
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- Repair A Avenue at Building 300Due Sep 9, 2026
- Sustain Aircraft Parking ApronMinnesotaDue Sep 8, 2026
- Z--Nps-Frsp - Restripe Parking Lots & CrosswalksDue Sep 8, 2026
- Permanent Pavement MarkingsDue Sep 11, 2026
- Multiple Trail Bridges Replacement Project Phase 2GeorgiaDue Sep 8, 2026
- Whiteman AFB - FY27 Airfield PavementMissouriDue Sep 4, 2026