SAM.gov36C25726Q0864
Open
Replace Fisher House 1 HVAC System
VETERANS AFFAIRS, DEPARTMENT OF · Texas
- Response deadline
- Sep 21, 2026 Due in 32 days
- Date posted
- Aug 20, 2026
- Source
- Open notice
Description
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to upgrade / replace the existing HVAC system with a new and updated system having proper installation and a manufacturer’s warranty at the Fisher house number 1 building located at 7485 Wurzbach Road, San Antonio, TX 78229.
Classifications
Documents (13)
- P01 - FB4CFY5B Fan Coil Units for Puron Refrigerant.pdf.pdf408 KBNot yet available
- P01 - ICRA_ FISHERHOUSE HVAC SYSTEM UPGRADE PROJECT_ 671-24-402.pdf.pdf557 KBNot yet available
- S02 - 36C25726Q0864 - Solicitation.pdf.pdf742 KBNot yet available
- P01 - 40RU-Carrier Air Handling Units.pdf.pdf1.5 MBNot yet available
- P01 - Carrier Central AC System Owners Manual.pdf.pdf313 KBNot yet available
- P01 - 33CS-68SI.pdf.pdf3.6 MBNot yet available
- P01 - 33CS-64SI.pdf.pdf185 KBNot yet available
- P01 - 33CS-33PS.pdf.pdf330 KBNot yet available
- P01 - 38AU Carrier Air Cooled Condensing Units.pdf.pdf2.3 MBNot yet available
- P01 - 2013-02-25 FH SA HVAC Zoning List.pdf.pdf38 KBNot yet available
- P01 - 2013-02-11 FH SA HVAC As-Built_SAN ANTONIO 02-09-13 MECHANICAL AS BUILTS.pdf.pdf1.8 MBNot yet available
- P01 - PCRA_FISHERHOUSE HVAC SYSTEM UPGRADE PROJECT_671-24-402.pdf.pdf604 KBNot yet available
- P01 - 33CS-47SI.pdf.pdf28 KBNot yet available
Contacts
- miguel.gonzalez4@va.gov9152821732
Similar contracts
- Supply and replace well head cap and an approximately 18-inch vertical extension, Guilford CTConnecticutDue Aug 24, 2026
- Z1DA--Replace Cast Iron Fittings 676-23-009Due Oct 14, 2026
- J--HVAC PREVENTATIVE MAINTENANCE SERVICE AT FORT MCHEDue Aug 26, 2026
- Z1DA--Replace Cast Iron Fittings 676-23-009WisconsinDue Sep 23, 2026
- J045--Project # 596-26-4 Construction for FMS Boiler ReplacementKentuckyDue Sep 21, 2026
- Industry Feedback Progressive Design-Build with Other Transaction Authority Process - Tyndall AFB HVAC FSRM ProjectsDue Aug 28, 2026