MACH1_AOI_Military Working Dog Kennels at JBSA-LOE1_Amend 1
- Response deadline
- Sep 11, 2026 Due in 18 days
- Date posted
- Aug 24, 2026
- Source
- Open notice
Description
Amendment 1 (24 Aug 26) Updates: "Presolicitation" This MACH1_AOI opportunity is updated with the following changes: 1. Previous Versions published as a "Special Notice" (Posting Type) were deleted & replaced with this "Presolicitation" posting 2. "Related Notice" block now reflects the associated MACH1_Parent Notice [FA8903-OT-MACH1] 3. Attached PDF was edited to remove Engineered Tensile Fabric Structures (ETF) as a mandatory material and allows for non-traditional construction methods. The submission deadline has been extended. See updated Attachment PDF: MACH1_AOI_FA890326OT002_MWDK_Amend_1_24 Aug 26 Original AOI Posting (11 Aug 2026) "Special Notice" This Area of Interest (AOI) is published under the Modernized Agile Construction Horizons (MACH1) Umbrella Program Notice. All submissions must adhere to the procedures and guidelines outlined in the parent MACH1 framework document unless otherwise tailored herein. Any resulting agreement will be an Other Transaction Agreement (OTA) executed under the statutory authority of 10 U.S.C. § 2808a. The 772nd Enterprise Sourcing Squadron (772 ESS), in coordination with the Air Force Civil Engineer Cetner (AFCEC), is seeking an innovative commercial partner to execute this project in two distinct Lines of Effort (LOE); Design & Planning (LOE 1), Physical Construction (LOE 2) for the scope defined as follows. The Government intends to upgrade both the Joint Base San Antonio (JBSA) - Lackland West facilities and the Chapman Training Annex, beginning with the Chapman Annex. The total 341st Training Squadron requirement is to house and train 850 dogs across two sites to support the Defense Military Working Dog (MWD) Kennel Program. This AOI seeks an innovative partner to rapidly develop a comprehensive, site-specific, and constructible design package using non-traditional construction approach built on Engineered Tensile Facilities (ETF) as the baseline structure. This initial Line of Effort (LOE 1) Design & Planning: will focus exclusively on delivering a mature design and a firm, executable plan for the full construction effort.The primary goal of LOE 1 is to produce a detailed, site-specific plan that enables a rapid and predictable approach for LOE 2: Physical Construction. See attachment PDF: MACH1_AOI_FA890326OT002_MWDK_10 Aug 26
Classifications
- PSCC219
Documents (2)
- MACH1_AOI_FA890326OT002_MWDK_10 Aug 26.pdf.pdf237 KBNot yet available
- MACH1_AOI_FA890326OT002_MWDK_Amend_1_24 Aug 26.pdf.pdf240 KBNot yet available
Contacts
Similar contracts
- MACH1_AOI_Owner's Advisor for METC Recapitalization_Amend 2TexasDue Sep 1, 2026
- MACH-1 Modernized Agile Construction HorizonsTexas
- Remote Video Game KitsTexasDue Aug 28, 2026
- MACH1_AOI_Muns_Igloos at Dyess AFB - LOE 1 and LOE 2TexasDue Sep 9, 2026
- Engineering Workbench Expert Collection - Intent to Sole SourceTexasDue Aug 21, 2026
- Film and Video Online Catalog - Intent to Sole SourceTexasDue Aug 20, 2026