Fire suppression system installation
- Response deadline
- Aug 25, 2026 Due in 8 days
- Date posted
- Aug 17, 2026
- Source
- Open notice
Description
Due to a recent fire in building 6418 at Moore Air Base, Texas, a wet fire suppression system is needed. Building 6418 was constructed in the early 1980s with no fire suppression initially. Contractor shall provide design/as-built drawings submittals and installation of a new retrofitted system. The system shall be a turnkey project encompassing everything needed to have a fully functioning fire suppression system. Solicitation documents are posted below. NOTE: For those wishing to attend the site visit, please send names of attendees to james.g.roloff@usda,gov. A valid drivers license or state ID is required. Amendment 1 is posted below. RFI: Does Building 6418 currently have an existing fire alarm panel/system that the sprinkler monitoring would tie into? If so, could you please provide the panel/system type, make/model, or any available details needed for a sprinkler monitoring quote? The fire panels are old and obsolete. They will be replaced at another time, but the new sprinkler system must be able to connect to a fire panel in the future. No monitoring is needed. The sign-in sheet for the site visit is posted below. Building drawings posted below. RFIs and responses posted below. Amendment 2 is posted below. It extends the closing date. Amendment 3 is posted below. It extends the closing date. Additional RFIs and responses posted below.
Classifications
Documents (11)
- 12639526Q0210-0001.pdf.pdf196 KBNot yet available
- 6418 Fire Suppression System Sign-In Sheet.pdf.pdf466 KBNot yet available
- Attachment 1_Statement of Work.docx.docx42 KBNot yet available
- 12639526Q0210-0002.pdf.pdf195 KBNot yet available
- 12639526Q0210.docx.docx80 KBNot yet available
- Building 6418 - Birds Eye View.pdf.pdf490 KBNot yet available
- Additional RFIs and Responses.docx.docx34 KBNot yet available
- 12639526Q0210-0003.pdf.pdf195 KBNot yet available
- MFFRF_Bldg 6418 drawings_06201984.pdf.pdf50.0 MBNot yet available
- Attachment 2_Federal Construction Wage Rates_Hidalgo County.txt.txt13 KBNot yet available
- RFIs and Responses.docx.docx17 KBNot yet available
Contacts
- james.g.roloff@usda.gov6125907603
Similar contracts
- N--REPLACE BOILER BURNERSDue Aug 24, 2026
- N--REPLACE HVAC AT BUXTON DOUBLE KEEPERS QUARTERS AT Due Aug 24, 2026
- LC - 3504 Install HVAC Fan Coil UnitDue Sep 9, 2026
- J045--Heating system piping repairs for the Captain James A. Lovell Federal Health Care Center, Building 134.Due Aug 24, 2026
- Northern Rockies Coordination Center HVAC replacementMontanaDue Sep 15, 2026
- J--GAOA CANM MUSEUM HVAC CHILLER REPAIRCODue Aug 20, 2026