SAM.gov70FBR626R00000021
Open
FEMA Region 6 Electric Motor Control Center Replacement
HOMELAND SECURITY, DEPARTMENT OF · Texas
- Response deadline
- Sep 21, 2026 Due in 4 days
- Date posted
- Sep 17, 2026
- Source
- Open notice
Description
Title: FEMA Region 6 Electric Motor Control Center Replacement Contract Type: Firm Fixed Price The purpose of this project is to replace the facility’s aging Electric Motor Control Center (Electrical Main Panel) to ensure operational continuity, safety, and compliance with regulatory requirements. The new system will address critical reliability issues, reduce operational risk, and provide modernized infrastructure for ongoing facility operations.
Classifications
Documents (8)
- 3.3.1- AMENDED- Evaluation Factors - Region 6 Electric Motor Control Center Replacement.pdf.pdf141 KBNot yet available
- AMENDED Solicitation- 70FBR626R00000021- Electric Motor Control Center Replacement.pdf.pdf1.1 MBNot yet available
- 1.1.4- Attachment A- SOO- Rev. 1 Electric Panel Motor Control Center- 8-25-2026.pdf.pdf379 KBNot yet available
- 3.3.1- Evaluation Factors - Region 6 Electric Motor Control Center Replacement.pdf.pdf187 KBNot yet available
- 1.10.2- Attachment C- WD-DB TX20260243 Rev. 1 5-18-2026 (2).pdf.pdf243 KBNot yet available
- Attachment D- Price-Cost Schedule.xlsx.xlsx12 KBNot yet available
- Attachment B- Statement of Contractor Assurance_9405.pdf.pdf292 KBNot yet available
- 70FBR626R00000017- Solicitation- R6 Electric Control Center.pdf.pdf201 KBNot yet available
Contacts
Similar contracts
- Humphreys Engineer Center Privatization of Electric SystemVirginia
- S--TEMP PUMPS ELECTRIC SERVICE at River Intake Facility
- S--Electric (Utility) Service for OJS DII Command Center
- Architect of the Capitol (AOC) Renewable Energy Certificate (Credit)District of ColumbiaDue Sep 16, 2026
- Notice of Intent to Sole Source - Tri-Lakes Electric UtilityColoradoDue Sep 18, 2026
- FEMA Region 6 Electric Motor Control Center ReplacementTexasDue Sep 18, 2026