Electrical Upgrade BLDG 1002
- Response deadline
- Aug 20, 2026 Closed
- Date posted
- Aug 7, 2026
- Source
- Open notice
Description
The project will consist of the installation of twelve (12) new electrical outlets. Install two (2) standard duplex outlets on the north wall, install three (3) standard duplex outlets on the east wall, install three (3) standard duplex outlets on the west wall, install one quad receptacle and one standard duplex outlet on the south wall, install one standard duplex outlet to each center posts. Install external generator transfer switch. All outlets shall be evenly spaced and routed to a centrally located junction box mounted on the east wall. All conduits and hardware shall be properly supported and secured. All materials shall be listed by UL and comply with NEC and local codes. Work will be performed at bldg. 1002 MFGI operation center Pleasanton Rd Ft. Bliss TX.
Classifications
Documents (2)
Contacts
Similar contracts
- Albany Transformer Testing & ServiceDue Oct 9, 2026
- Albany Transformer Testing & ServiceDue Oct 9, 2026
- CON-NRM-663A4-24-209 Replace Fire Suppression Systems BLDG 61WADue Oct 7, 2026
- Request for Quotes - Rental of UPS for Phone RoomDue Oct 2, 2026
- Albany Transformer Testing & ServiceNew YorkDue Oct 9, 2026
- Fire Alarm and Mass Notification System Upgrades for DDJC, Tracy, CADue Oct 13, 2026