Country Club west Stoplog Rehabilitation
- Response deadline
- Sep 10, 2026 Due in 19 days
- Date posted
- Aug 22, 2026
- Source
- Open notice
Description
Added Amendment I This is a 100% small business set-aside with a small business size standard of $45M. An offer guarantee is not required. Add pre-bid conference notes and sign-in log. Added SF 1442 to attachements The United States Section of the International Boundary and Water Commission (USIBWC) requires rehabilitation of the Country Club Bridge West Stoplog Structure located in El Paso, TX. The project includes mobilization, traffic control, removal and replacement of the existing expansion joint, repair of deteriorated concrete, roadway restoration, disposal of construction debris, and final cleanup. These repairs are necessary to restore movement between the roadway and stoplog structure, reduce continued deterioration, and maintain a safe and serviceable bridge approach. See attachments Standard Form 1442 will be added by amendment. The Contractor shall furnish all labor, material, and equipment necessary to complete Country Club West Stoplog Rehabilitation. This is a FIRM FIXED PRICE CONTRACT.The estimated magnitude of this project will be $25,000.00 to $100,000.00. L.01 - Pre-Bid Conference and Site Visit L.01.A. All potential bidders are requested to attend the Pre-Bid Conference/Site Visit to be held at: USIBWC AmericanDam Field Office, Conference Room, 2616 W Paisano Dr., El Paso, TX 79922 Tuesday, August 18, 2026, at 9:30 AMMDT. L.01.B. Names of individuals who plan to attend shall be furnished before 12:00 PM MDT on Monday, August 17, 2026 byemail submission to Philip.johnson@ibwc.gov .
Classifications
Documents (17)
- IBWC Form 245B Backup Information.pdf.pdf60 KBNot yet available
- IBWC Form 245A Minimum Quals for Award-Joint Venture.docx.docx54 KBNot yet available
- Country Club West Rehab_Damage Report_USIBWC_20260610.pdf.pdf4.5 MBNot yet available
- Arcadis_Sunland Levee Repair Design Report_20220204.pdf.pdf47.1 MBNot yet available
- IBWC22M0005 MOA Country Club Floodgates.pdf.pdf1.0 MBNot yet available
- 191BWC26B0013 Amendment I.pdf.pdf563 KBNot yet available
- IBWC Form 245 Minimum Quals for Award.docx.docx58 KBNot yet available
- Sunland Bridge West Stoplog Shop Dwg_Flood Control Intl.pdf.pdf494 KBNot yet available
- Country Club West_Repair Recommendation_Arcadis_20250808.pdf.pdf318 KBNot yet available
- Wage Determination Highway TX20260293 20260518.pdf.pdf196 KBNot yet available
- 191BWC26B0013 CC West Stoplog Rehab Drawings 20260806.pdf.pdf7.7 MBNot yet available
- IBWC_Form_110_Cert_of_Authority_for_Signing.pdf.pdf217 KBNot yet available
- 191BWC26B0013 SF 1442.pdf.pdf137 KBNot yet available
- IBWC_Form_116_Statement_of_Equipment.pdf.pdf19 KBNot yet available
- Excerpts 191BWC22C0011 Sunland Levee Dwgs.pdf.pdf17.7 MBNot yet available
- 191BWC26B0013 CC West Stoplog Rehab Specs 20260806.pdf.pdf2.5 MBNot yet available
- FXSA_Survey Report_20220303.pdf.pdf268 KBNot yet available
Contacts
- philip.johnson@ibwc.gov9152559324
- seone.jones@ibwc.gov9158324120
Similar contracts
- COMPOUND PERIMETER PATH ASPHALT REPAIRBogotáDue Aug 27, 2026
- Repairs to Base Roads and Parkings, 156th WG Muñiz ANGBPuerto RicoDue Sep 8, 2026
- Whiteman AFB - FY27 Airfield PavementMissouriDue Aug 28, 2026
- SUF-North Shore ERFO RepairsDue Sep 8, 2026
- Forest Service Road Maintenance Annual OHV San Bernardino National ForestCaliforniaDue Aug 24, 2026
- Z--SACRAMENTO RIVER TRAIL REPAVING GAOADue Sep 3, 2026