Civic AI
Civic AI
Procurement intelligence
SAM.gov191BWC26B0013
Open

Country Club west Stoplog Rehabilitation

Response deadline
Sep 10, 2026
Due in 30 days
Date posted
Aug 11, 2026

Description

The United States Section of the International Boundary and Water Commission (USIBWC) requires rehabilitation of the Country Club Bridge West Stoplog Structure located in El Paso, TX. The project includes mobilization, traffic control, removal and replacement of the existing expansion joint, repair of deteriorated concrete, roadway restoration, disposal of construction debris, and final cleanup. These repairs are necessary to restore movement between the roadway and stoplog structure, reduce continued deterioration, and maintain a safe and serviceable bridge approach. See attachments Standard Form 1442 will be added by amendment. The Contractor shall furnish all labor, material, and equipment necessary to complete Country Club West Stoplog Rehabilitation. This is a FIRM FIXED PRICE CONTRACT.The estimated magnitude of this project will be $25,000.00 to $100,000.00. L.01 - Pre-Bid Conference and Site Visit L.01.A. All potential bidders are requested to attend the Pre-Bid Conference/Site Visit to be held at: USIBWC AmericanDam Field Office, Conference Room, 2616 W Paisano Dr., El Paso, TX 79922 Tuesday, August 18, 2026, at 9:30 AMMDT. L.01.B. Names of individuals who plan to attend shall be furnished before 12:00 PM MDT on Monday, August 17, 2026 byemail submission to Philip.johnson@ibwc.gov .

Classifications

Documents (15)

  • IBWC Form 245B Backup Information.pdf
    .pdf60 KB
    Download
  • IBWC Form 245A Minimum Quals for Award-Joint Venture.docx
    .docx54 KB
    Download
  • Country Club West Rehab_Damage Report_USIBWC_20260610.pdf
    .pdf4.5 MB
    Download
  • Arcadis_Sunland Levee Repair Design Report_20220204.pdf
    .pdf47.1 MB
    Download
  • IBWC22M0005 MOA Country Club Floodgates.pdf
    .pdf1.0 MB
    Download
  • IBWC Form 245 Minimum Quals for Award.docx
    .docx58 KB
    Download
  • Sunland Bridge West Stoplog Shop Dwg_Flood Control Intl.pdf
    .pdf494 KB
    Download
  • Country Club West_Repair Recommendation_Arcadis_20250808.pdf
    .pdf318 KB
    Download
  • Wage Determination Highway TX20260293 20260518.pdf
    .pdf196 KB
    Download
  • 191BWC26B0013 CC West Stoplog Rehab Drawings 20260806.pdf
    .pdf7.7 MB
    Download
  • IBWC_Form_110_Cert_of_Authority_for_Signing.pdf
    .pdf217 KB
    Download
  • IBWC_Form_116_Statement_of_Equipment.pdf
    .pdf19 KB
    Download
  • Excerpts 191BWC22C0011 Sunland Levee Dwgs.pdf
    .pdf17.7 MB
    Download
  • 191BWC26B0013 CC West Stoplog Rehab Specs 20260806.pdf
    .pdf2.5 MB
    Download
  • FXSA_Survey Report_20220303.pdf
    .pdf268 KB
    Download

Contacts

Similar contracts

Explore more