B-21: Squadron Ops/Bomber Generation Squadron, Dyess AFB, Texas
- Response deadline
- Oct 6, 2026 Due in 14 days
- Date posted
- Sep 22, 2026
- Source
- Open notice
Description
SUBJECT: Sources Sought Notice/RFI – B-21: Squadron Ops/Bomber Generation Squadron, Dyess AFB, Texas DISCLAIMER: This Sources Sought (SS) is for planning and market research purposes only and does not constitute a Request for Proposals (RFP) or an Invitation for Bids (IFB). This notice is issued under the authority of 10 U.S.C. § 2808a (Other Transaction Authority for Construction and Repair) and is not subject to the Federal Acquisition Regulation (FAR). No solicitation is available at this time. The Government will not pay for any information submitted in response to this notice. PURPOSE: The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection. PROJECT DESCRIPTION This project will construct a combined Squadron Operations and Bomber Generation Squadron Facility at Dyess Air Force Base, Texas, approximately 167,164 gross square, to support the B-21 program, with an estimated Construction Cost Limitation (CCL) of $164,651,000. A portion of this facility will be two-story construction while the remaining portion will be a high bay maintenance hangar. Construction includes reinforced concrete drilled pier foundation, structural steel frame, masonry and insulated metal panel walls, standing seam metal roof and interior finishes. Special foundation structures due to local expansive soils. Site preparation includes site grading, construction site establishment, demolition of existing pavements and demolition of underground utilities within the site. Site improvements include earthwork landscaping, concrete pads and other exterior appurtenances. Utilities include domestic and fire protection water, electrical, sanitary sewer, storm water, natural gas and communications systems, and a 588-ton HVAC capacity. Roadways, Sidewalks and Parking includes new access drives, sidewalks, truck unloading area, Government Owned Vehicle parking areas and Personally Owned Vehicle parking lots. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of Defense anti-terrorism/force protection requirements per Unified Facility Criteria 4-010-01, DoD Minimum Anti-terrorism Standards for Buildings. INSTRUCTIONS TO INDUSTRY Review Attached Project Information Packet (PIP): Interested firms are directed to review the attached document. This packet provides comprehensive project requirements, constraints, and the complete questionnaire reference. Submit Responses via Microsoft Forms: To streamline the collection and analysis of industry feedback, responses to the market research questionnaire must be submitted electronically via the following link: Online Feedback Form: https://forms.osi.apps.mil/r/rvvBByEVkA Response Due Date: All electronic responses must be submitted via the online form no later than October 6, 2026, at 2:00 PM Central Time (CT). POINTS OF CONTACT Contract Specialist: Christopher R. Preston II, Christopher.R.Preston@usace.army.mil, (817) 940-2482. Contracting Officer: Dianne K. Grimes, Dianne.K.Grimes@usace.army.mil, (817) 659-6765
Classifications
Documents (2)
- Online Feedback Form (Please review Project Information Packet First)Not yet available
- Project Information Packet -B-21 Squadron Ops Bomber Generation Squadron 9-22-26.docx.docx36 KBNot yet available
Contacts
Similar contracts
- Alaska Construction Multiple Award Task Order Contract (MATOC)Due Oct 2, 2026
- Repair Hail Damage Booneville, ARArkansasDue Sep 28, 2026
- Disaster Resiliency Program Phase 3, Creech Afb, NevadaDue Sep 25, 2026
- FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 55 Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville ILDue Oct 22, 2026
- Fy27 Special Project Usnh Yokosuka Alteration, JapanKanagawaDue Oct 7, 2026
- SLAC Job Order ContractCaliforniaDue Sep 29, 2026