Electrical Control Components: Circuit Breakers, Terminal Blocks, Switches, and DIN-Rail Accessories
- Response deadline
- Oct 9, 2026 Due in 7 days
- Date posted
- Oct 2, 2026
- Source
- Open notice
Description
UT-Battelle, LLC. (the Company), is the Management and Operations Contractor for the Oak Ridge National Laboratory (ORNL), located in Oak Ridge, Tennessee. The Company seeks proposals for the Electrical Control Components: Circuit Breakers, Terminal Blocks, Switches, and DIN-Rail Accessories, or their domestic equivalents, to support a department of Energy (DOE) funded project. Request for Quotation - RFQ - PR506958, Electrical Control Components: Circuit Breakers, Terminal Blocks, Switches, and DIN-Rail Accessories Attachment A - Terms and Conditions - Purchase Order Commercial Products and Services, dated 01.13.2026 Attachment B - Prime Flowdown Clauses, dated 07.06.2026 Attachment C - Bill of Materials - PR506958 Attachment D - Reps and Certs - Abbreviated - 03.09.2026 FAR 52.211-6, Brand Name or Equal applies.
Classifications
Documents (5)
- Attachment C - Bill of Materials - PR506958.pdf.pdf49 KBNot yet available
- Attachment D - Reps-and-Certs - Abbreviated - 03.09.2026.pdf.pdf965 KBNot yet available
- Attachment A - Terms and Conditions - Purchase Order Commercial Products and Services BSD-CS-2154 - 01.13.2026.pdf.pdf256 KBNot yet available
- RFQ - PR506958.pdf.pdf133 KBNot yet available
- Attachment B - Prime-Flowdown-Clauses-BSD-CS-2258-07.06.2026.pdf.pdf273 KBNot yet available
Contacts
Similar contracts
- Narrows Exciter J&A for Sole SourceMississippi
- Switch, InterlockDue Oct 13, 2026
- 1KVDC Power Distribution Components or Domestic EquivalentTennesseeDue Oct 9, 2026
- Fuseholder, ReceptacleDue Oct 16, 2026
- Circuit Breaker BoxDue Oct 16, 2026
- Circuit BreakerDue Nov 2, 2026