34.5 kV Outdoor Distribution Three-Pole Side-Break Alduti-Rupter Switches and Mounting Arrangements
- Response deadline
- Aug 26, 2026 Due in 7 days
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
UT-Battelle, LLC. (the Company), is the Management and Operations Contractor for the Oak Ridge National Laboratory (ORNL), located in Oak Ridge, Tennessee. The Company seeks proposals for the 34.5 kV Outdoor Distribution Three-Pole Side-Break Alduti-Rupter Switches and Mounting Arrangements, or their domestic equivalents, to support a department of Energy (DOE) funded project. Request for Quotation - RFQ - PR493245, 34.5 kV Outdoor Distribution Three-Pole Side-Break Alduti-Rupter Switches and Mounting Arrangements Attachment A - Terms and Conditions - Purchase Order Commercial Products and Services, dated 01.13.2026 Attachment B - Prime Flowdown Clauses, dated 07.06.2026 Attachment C - Bill of Materials - PR493245 Attachment D - Reps and Certs - Abbreviated - 03.09.2026 FAR 52.211-6, Brand Name or Equal applies.
Classifications
Documents (5)
- RFQ - PR493245.pdf.pdf134 KBNot yet available
- Attachment D - Reps-and-Certs - Abbreviated - 03.09.2026.pdf.pdf965 KBNot yet available
- Attachment B - Prime-Flowdown-Clauses-BSD-CS-2258-07.06.2026.pdf.pdf273 KBNot yet available
- Attachment A - Terms and Conditions - Purchase Order Commercial Products and Services BSD-CS-2154 - 01.13.2026.pdf.pdf256 KBNot yet available
- Attachment C - Bill of Materials - PR493245.pdf.pdf48 KBNot yet available
Contacts
Similar contracts
- CIRCUIT BREAKERDue Sep 1, 2026
- 59--ADAPTER KIT,BREAKERDue Aug 31, 2026
- SWITCH,PUSHDue Nov 17, 2026
- CIRCUIT BREAKERDue Aug 24, 2026
- 59--HANDLE,SWITCHDue Sep 2, 2026
- 59--REMOTE CONTROL,CIRCUITDue Sep 2, 2026