Tailwater and Control Tower paving, sealing, and striping for Nolin River Lake
- Response deadline
- Sep 1, 2026 Closed
- Date posted
- Aug 17, 2026
- Source
- Open notice
Description
Tailwater and Control Tower paving, sealing, and striping for Nolin River LakeThe contractor���������������������������������������������������������������������������������s work and responsibility will include furnishing all labor, materials, supplies, tools and, equipment necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work will be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will shall begin within 10 calendar days of Notice to Proceed and must conclude 90 calendar days after Notice to Proceed.Location:United States Corps of EngineersNolin River Lake2150 Nolin Dam RoadMammoth Cave, KY 42259This procurement is 100% set-aside for Small Business, NAICS 237310, Size Standard $45M.Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.Note: The contract award will be based on lowest total price to the Government.** Bid Bonds are required and must be provided at the same time of your submission. **A site visit is highly recommended, Contractors are encouraged to attend a site visit to review the complexities of the work site, verify existing conditions, and exact measurements. please reach out to Kerry Sanders at 270- 286-6613 to schedule a site visit.Quotes are due 1 September 2026, 12:00PM Eastern Time.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Z--St. Marks NWR Aucilla Tram Road Bridge DBDue Oct 19, 2026
- AZ BL COLO 7528(1) Burro Creek RoadArizonaDue Nov 17, 2026
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadUtahDue Nov 10, 2026
- Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1)New YorkDue Dec 1, 2026
- HI FLAP CR562(1) Kilauea PointHawaii
- Repair Storm Damage Imperial Dam Road at YPG, AZDue Oct 21, 2026