Description
250 kW Generator Dual FuelStandby Generator120/2083 PhaseType of Enclosure is NEMA 3R Rated; No tank required, natural gas is available at the site; Receiving facility and forklift available, so no offloading required. Battery and Battery Charger required.Amendment 0001 - Due date modification. Amendment 0002 - Correction to EPA requirements. Amendment 0003 - Updated EPA requirement in the description.