SAM.gov140FS126Q0200
Open
Spring Creek Automatic Transfer Switch
- Response deadline
- Sep 11, 2026 Due in 8 days
- Date posted
- Sep 3, 2026
- Source
- Open notice
Description
WA-SPRING CRK NFH-AUTO TRANSFER SWITCH The Contractor shall furnish all qualified labor, supervision, equipment, replacement equipment, parts, materials, supplies, tools, transportation, testing instruments, programming tools, and incidental services necessary to replace the failed ATS PLC; repair or replace other ATS components as necessary for compatibility and proper operation; restore phase monitoring, manual and automatic generator testing with load transfer, and existing alarm-system communication; repair or replace three PM800 displays; perform functional testing and commissioning; and provide required documentation in accordance with the PWS.
Classifications
Documents (1)
- Sol_140FS126Q0200.pdf.pdf819 KBNot yet available
Contacts
- oscar_orozco@ios.doi.gov4242769541
Similar contracts
- Cable Fiber Install ATC Tower Dobbins ARBGeorgiaDue Sep 18, 2026
- Amendment 0001 - Maintenance and Repair (M&R) of Compressors, Generators, Fire Pumps and Trash-Racks, Darby Military Community (DMC), Livorno, ItalyPisaDue Sep 14, 2026
- Bedford Emergency Call Box Services RFQ to Authorized Service ProvidersMassachusettsDue Sep 14, 2026
- H--Cuga- Upgrade Wr Campground ElectricalDue Sep 20, 2026
- CRTC Base Paging SystemMississippiDue Sep 15, 2026
- CSS 99154 Upgrade Existing Lighting to LEDDue Sep 10, 2026