SAM.gov140FS126Q0200
Open
Spring Creek Automatic Transfer Switch
- Response deadline
- Sep 11, 2026 Closed
- Date posted
- Sep 3, 2026
- Source
- Open notice
Description
WA-SPRING CRK NFH-AUTO TRANSFER SWITCH The Contractor shall furnish all qualified labor, supervision, equipment, replacement equipment, parts, materials, supplies, tools, transportation, testing instruments, programming tools, and incidental services necessary to replace the failed ATS PLC; repair or replace other ATS components as necessary for compatibility and proper operation; restore phase monitoring, manual and automatic generator testing with load transfer, and existing alarm-system communication; repair or replace three PM800 displays; perform functional testing and commissioning; and provide required documentation in accordance with the PWS.
Classifications
Documents (1)
- Sol_140FS126Q0200.pdf.pdf819 KBNot yet available
Contacts
- oscar_orozco@ios.doi.gov4242769541
Similar contracts
- Sources Sought -Building 493 Generator and Backup Power Installation- Red River Army DepotTexasDue Nov 13, 2026
- 692-21-101 CON NRM Improve Site Lighting and Lighting Controls for Energy EfficiencyOregonDue Nov 3, 2026
- Micro Gin Motor Control Center UpgradeMississippiDue Oct 26, 2026
- Upgrade Fire Detection System at FDC Honolulu, HawaiiHawaiiDue Oct 28, 2026
- Removal of Abandoned Telecommunications EquipmentDistrict of ColumbiaDue Oct 23, 2026
- Air Compressor RelocationDistrict of ColumbiaDue Oct 28, 2026