Uscgc Calhoun Ds Fq2 Fy27
- Response deadline
- Oct 7, 2026 Due in 13 days
- Date posted
- Sep 24, 2026
- Source
- Open notice
Description
24 Sept 2026: Amend 0002: The purpose is to extend the proposal due date from 28 Sept 2026 to 07 October 2026, no later than 11AM EST. This is too allow interested contractors time to submit requests for the new drawings and finalize their proposal prior to the due dates. Attached are Attach A - Specs_Rev 02, responses to questions received titled "USCGC Calhoun-Request for Clarification Responses." Note: Important dates: - Request for Technical Package: 29 Septemebr 2026, NLT 11AM EST. - Proposal due date: 07 October 2026, NLT 11AM EST. --------------------------------------------------------------------------------------------------------------------------------------------------------------------- 04 Sept 2026: Amend 0001: The purpose is to add an additional definitive work item into the Specs (WORK ITEM 3: Talon Grid (Type 18-08), Inspect and Test), extend the proposal due date from 14 Sept 2026 to 28 Sept 2026, provide a suspense date of NLT 11AM EST, 11 Sept 2026 for technical package requests due to the additional work item, and provide the following revised documents: Attachment A - Specification CALHOUN (WMSL-759), Rev 1, dtd 03SEP2026 and Attachment B Pricing CALHOUN (WMSL-759) SOS&S, Rev 1. --------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This requirement is for the Contractor to provide all necessary labor, services, supplies, materials, equipment, power, accessories, personnel, and other things as necessary, except otherwise specified to perform dockside repairs to the USCGC CALHOUN (WMSL-759), a 418' National Security Cutter in accordance with the solicitation, schedule and specifications. Reference Attachment A - Specification, Rev-0 dated 20 August 2026. The Work Items included but not limited to the following: WORK ITEM 1: Circuit Breakers (Draw Out), Inspect and Test WORK ITEM 2: Miscellaneous System Relief Valves, 5 Year Certification WORK ITEM 3: Deck Covering (Slip-Resistant) Stern Deck, Renew WORK ITEM 4: Tenting (Stern Deck), Provide WORK ITEM 5: Deck Covering (Polymeric), Repair and Seal WORK ITEM 6: Tanks (MP Fuel Service), Clean and Inspect WORK ITEM 7: Tanks (MP Fuel Storage and Overflow), Clean and Inspect WORK ITEM 8: Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect WORK ITEM 9: Tank (Water Mist), Clean and Inspect WORK ITEM 10: Tanks (Water Mist), Preserve (Partial) WORK ITEM 11: Potable Water Pneumatic Tank, Clean and Inspect WORK ITEM 12: TCTO: Dewatering Overboard Discharge Connections, Install WORK ITEM 13: TCTO: Potable Water FWD Hose Connection, Install WORK ITEM 14: TCTO: Dry Provision Storeroom, Modify WORK ITEM 15: TCTO: HVAC System (Port Aft Capstan), Modify WORK ITEM 16: TCTO: Weather Deck Scuppers, Install WORK ITEM 17: MPAC Demister, Install WORK ITEM 18: Temporary Services, Provide – Cutter WORK ITEM 19: Welding, Provide (General) WORK ITEM 20: Fire Prevention, Provide. Please reference Attachment G - CALHOUN DS FQ2 FY27 -Provisions and Clauses. The following are identified hard dates: - NLT 26 AUG 2026, by 12PM EST - Requests for Techncial Packages are due. - NLT 03 SEPT 2026, by 12PM EST - Any /all questions related to this solicitation are due. - NLT 14 SEPT 2026, by 12PM EST - Quotes are due.
Classifications
Documents (12)
- Attachment A- Specification CALHOUN (WMSL-759) REV2.pdf.pdf2.7 MBNot yet available
- Attachment D - Past Performance Questionnaire (PPQ) USCGC CALHOUN (WMSL-759) (003).docx.docx28 KBNot yet available
- Attachment E- FLETC Base Access and Pier Laydown.pdf.pdf711 KBNot yet available
- USCGC CALHOUN- Request for Clarification Responses.pdf.pdf401 KBNot yet available
- Attachment G- CALHOUN DS FQ2 FY27 - Provisions and Clauses.pdf.pdf737 KBNot yet available
- Solicitation Amendment_70Z08526QLREP0025 0002.pdf.pdf446 KBNot yet available
- Attachment B- Pricing Schedule CALHOUN (WMSL-759).xlsx.xlsx19 KBNot yet available
- Attachment C - Request for Clarification USCGC CALHOUN (WMSL-759).docx.docx21 KBNot yet available
- Attachment F- Non-Disclosure Agreement.pdf.pdf3.4 MBNot yet available
- Attach B - Pricing Schedule_CALHOUN (WMSL 759) DS FQ2 FY27_SOSandS R1.xlsx.xlsx20 KBNot yet available
- Amend 00001 to Solicitation 70Z08526QLREP0025_04SEPT2026.pdf.pdf601 KBNot yet available
- 70Z08526QLREP0025 CALHOUN DS FQ2 FY27.pdf.pdf183 KBNot yet available
Contacts
Similar contracts
- US Coast Guard Cutter (USCGC) EMLEN TUNNELL (WPC 1145) FY 27 QL3 Dockside AvailabilityDue Oct 27, 2026
- Cgc Hollyhock DrydockDue Oct 7, 2026
- USNS OSCAR V. PETERSON FY 27 Mid-Term AvailabilityDue Oct 16, 2026
- USNS POINT LOMA (T-EPF 15) Mid-Term AvailabilityDue Oct 20, 2026
- Valve, Stop and Stop ChDue Oct 5, 2026
- Request for Quote (RFQ) for Air Ejector & Condenser Removal, Installation and Crate for ShipmentLatinaDue Sep 28, 2026