FY26 NPTU High-Pressure Air Compressors (HPAC) Mx
- Response deadline
- Sep 21, 2026 Due in 6 days
- Date posted
- Sep 15, 2026
- Source
- Open notice
Description
The Nuclear Power Training Unit (NPTU) requires a major maintenance overhaul of its High-Pressure Air (AHP) System to maintain operational reliability, readiness, and mission support. To sustain critical operations, the multi-stage AHP compressors require an 8,000-hour major overhaul, encompassing complete teardown, component replacement, tolerance verification, and re-certification. The Contractor shall provide all labor, certified replacement parts, tooling, and test equipment necessary to execute the 8,000-hour major overhaul on the designated AHP compressors. All maintenance, inspections, and re-certification procedures shall be performed strictly in accordance with Maintenance Requirement Card (MRC) AHP-R-2 (Rev 3) (Attachment 02). Maintenance actions must be phased to ensure continuous, redundant compressor availability throughout the period of performance. Please be advised that the full requirements, including Instructions to Offerors (FAR 52.212-1) and the basis for evaluation (FAR 52.212-2), are detailed in the solicitation attachments. A thorough review of all attached documents is required for a compliant submission.
Classifications
Documents (5)
- Solicitation - FA441826Q0098.pdf.pdf513 KBNot yet available
- Attachment 3 - HPAC Layout_NPTU.pdf.pdf4.8 MBNot yet available
- Attachment 2 - Maintenance Requirement Card.pdf.pdf1.6 MBNot yet available
- Attachment 1 - Statement of Work.pdf.pdf95 KBNot yet available
- Attachment 4 - HPAC M(x) Brand Name JA.pdf.pdf2.0 MBNot yet available
Contacts
Similar contracts
- Generators Maintenance Contract for Base + 2 option years at the Watervliet Arsenal, NY 12189New YorkDue Sep 21, 2026
- 30T Crane RepairFloridaDue Sep 25, 2026
- LD5 Anchor Bar RefurbishmentDue Sep 25, 2026
- Air Flask Ultrasonic Shear Wave Inspection with UT Thickness InspectionVirginiaDue Sep 18, 2026
- Maintenance and Software Support for Box Making MachinesMarylandDue Sep 17, 2026
- Generator Maintenance and RepairGeorgiaDue Sep 18, 2026