Civic AI
Civic AI
Procurement intelligence
SAM.govDOIDFBO260067
Open

Sources Sought for DMMU - Fort Hood

INTERIOR, DEPARTMENT OF THE
Response deadline
Jul 16, 2026
Closed
Date posted
Jul 9, 2026

Description

This Sources Sought notice is issued by the government to acquire information regarding able and available contractors to perform design and execute repairs and modernization of the Dalton Mountain Multi-use (DMMU) Range on Fort Hood, TX. Contractors who choose to respond to this notice do so voluntarily with no expectation of reimbursement of any kind at any point. The government is looking for active System of Award Management (SAM) registered small businesses with the NAICS 236220 in their SAM profile. In the past, this work has been performed by Service-Disabled Veteran Owned Small Businesses (SDVOSB). Each respondent is asked to submit a capabilities statement reflective of their ability to do the work as outlined in the draft Statement of Work (SOW) attached to this notice, including all base and optional tasks, along with proof of their active SAM registration. The disclosure of magnitude for this project is between up to $15M, which includes all base and optional tasks. Responses to this notice are due no later than July 16, 2026 at 4:00PM (EDT) and shall be emailed to Kevin Woody at Kevin_woody@ibc.doi.gov. No questions will be answered regarding this notice. Z2PZ REPAIR OR ALTERATION OF OTHER NON-BUILDING FACILIT 236220 Commercial and Institutional Building Construction $45

Classifications

Documents (29)

  • EXHIBIT_O___TC25-8_Minimum_MAT_Specification_Requirements.pdf
    .pdf303 KB
    Download
  • EXHIBIT_N_-_Mandatory_Shutdown_times.pdf
    .pdf131 KB
    Download
  • EXHIBIT_X_-_CCRB_FIRING_POSITION_ASBUILT_DRAWING.pdf
    .pdf93 KB
    Download
  • Fort_Hood_DMMU_MAT8_SOW_23JUN26_0800_CT.pdf
    .pdf352 KB
    Download
  • EXHIBIT_K_-_Target_Protection_-_July_2017.pdf
    .pdf2.0 MB
    Download
  • EXHIBIT_F_-_1984_DMMU_Asbuilts_(2).pdf
    .pdf43.6 MB
    Download
  • EXHIBIT_H_-_Portable_HSAT_Specifications.pdf
    .pdf210 KB
    Download
  • EXHIBIT_Y_-_PKRA_FIRING_POSITION_ASBUILT_DRAWING.pdf
    .pdf253 KB
    Download
  • EXHIBIT_P_-DMMU_Target_designation_reference_TAB_A___Moving_Armored_Targets_(MATs).pdf
    .pdf104 KB
    Download
  • EXHIBIT_Q___Range_Locations_for_Concrete_Ammo_Points.pdf
    .pdf314 KB
    Download
  • EXHIBIT_S___Target_Spare_Parts.pdf
    .pdf209 KB
    Download
  • EXHIBIT_W_-_BGRC_FIRING_POSITION_ASBUILT_DRAWING.pdf
    .pdf86 KB
    Download
  • EXHIBIT_J_-_Moving_Armor_Target_(MAT)_-_Aug2017.pdf
    .pdf1.5 MB
    Download
  • EXHIBIT_M_-_Species_List_for_Range_Seed.pdf
    .pdf91 KB
    Download
  • EXHIBIT_I_-_Stationary_ArmorTarget_(SAT)_-_Aug2017.pdf
    .pdf1.5 MB
    Download
  • EXHIBIT_E___DMMU_MAT_System_locations_and_existing_conditions.pdf
    .pdf4.1 MB
    Download
  • EXHIBIT_Z_-_QTR_FIRING_POSITION_ASBUILT_DRAWING.pdf
    .pdf96 KB
    Download
  • EXHIBIT_R_-_Range_Locations_for_Cement_Stabilization_at_Ammo_Points.pdf
    .pdf314 KB
    Download
  • EXHIBIT_B___DMMU_Range_Location_Map.pdf
    .pdf237 KB
    Download
  • EXHIBIT_C___DMMU_SUMMARY_MATs_Power_Centers_RLMs.pdf
    .pdf453 KB
    Download
  • EXHIBIT_V_-_EXISTING_CONDITIONS_PHOTOS.pdf
    .pdf609 KB
    Download
  • EXHIBIT_T_-_Water_Point.pdf
    .pdf682 KB
    Download
  • EXHIBIT_L_-_Portable_Armored_Target_Protection.pdf
    .pdf791 KB
    Download
  • EXHIBIT_U_-_Firing_Positions_Revision_6.pdf
    .pdf683 KB
    Download
  • EXHIBIT_P_-DMMU_Target_designation_reference_TAB_B_-_Startionary_Armored_Targets_(SATs).pdf
    .pdf158 KB
    Download
  • EXHIBIT_D_-_Gate_Design.pdf
    .pdf1.6 MB
    Download
  • EXHIBIT_G_-_Range_Limit_Marker_Design.pdf
    .pdf779 KB
    Download
  • EXHIBIT_A_-_FTHOOD_DMMU_Aerial.pdf
    .pdf2.1 MB
    Download
  • EXHIBIT_F_-_1984_DMMU_Asbuilts_(1).pdf
    .pdf50.0 MB
    Download

Contacts

Explore more