SAM.govW9127826RA105
Open
Selma Alabama Flood Risk Management and Bank Stabilization Project
- Response deadline
- Sep 2, 2026 Closed
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
The U.S. Army Corps of Engineers, Mobile District, has a need for a contract to design and construct a flood risk management and bank stabilization project in the vicinity of downtown Selma, Alabama. The current design is anticipated to consist of approximately 1,000 linear feet of soldier-pile wall along the Alabama River. The soldier pile wall would be constructed to a top elevation of 100-ft NAVD88, and a secondary retaining wall would be constructed to a top elevation of 110-ft NAVD88. Rip-rap protection would be placed at the toe of the wall to a top elevation of 90-ft NAVD88.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- GAOA Cordova Outhouse Replacement Chugach NFAlaskaDue Oct 6, 2026
- Pointe Mouillee Confined Disposal Facility Cells 1 and 2 Fill ManagementDue Oct 20, 2026
- Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance ChannelDue Oct 13, 2026
- FY27 CCSC Entrance Channel Maintenance DredgingTexasDue Oct 9, 2026
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Oct 2, 2026
- Addendum 04 Advance Measures Mendenhall Glacier Juneau, AlaskaAlaskaDue Oct 15, 2026