TEPEE WORK CENTER WELL PUMP PROJECT
- Response deadline
- Jul 15, 2026 Closed
- Date posted
- Jun 3, 2026
- Source
- Open notice
Description
PROJECT: TEPEE WORK CENTER WELL PUMP PROJECT - BLACK HILLS NATIONAL FOREST- CUSTER COUNTY, SD JUNE 3, 2026: AMENDMENT ONE (A0001) - Please read this AMENDMENT (A0001) in its entirety as it moves the due dates up for questions and quote submissions. In addition, the POP has been amended and a site visit added for this project. AMENDMENT ONE (A0001) is located in the Attachments/Links. Please read each of the attached documents (found in the Attachments/Links section) in their entirety. Questions are due by June 16, 2026, at 9:00 a.m. Central Daylight Time and Quotes are due by July 15, 2026, at 9:00 a.m. Central Daylight Time. Description of Work: The contractor shall provide all labor, materials, equipment, testing, and documentation necessary for the removal of the existing and replacement of a new deep-well pump system for a 921-foot well, including the installation of a new 5 HP submersible pump and associated controls. See the SOW, SPECS, and SOI for additional information.
Classifications
Documents (6)
- DownloadAmend 0001_SUMMARY OF CHANGES.pdf.pdf247 KB
- DownloadAttach 4_SCA_WD_2015-5367_South Dakota.pdf.pdf6.3 MB
- DownloadAttach 3_Specifications_Tepee Well Pump_7May2026.pdf.pdf338 KB
- Download1240LT26Q0079_Tepee WC Well Pump.pdf.pdf345 KB
- DownloadAttach 2_ Schedule of Items.xlsx.xlsx11 KB
- DownloadAttach 1_SOW.pdf.pdf305 KB
Contacts
Similar contracts
- J045--Terminate - Isolate 8-inch Steam PipelineNorth CarolinaDue Aug 19, 2026
- Z--BLRI -PERFORM MAINT. ON THE PISGAH WWTPDue Aug 31, 2026
- Repair Water Tower B738TexasDue Sep 2, 2026
- Sole Source for Irrigation line at Moore Air BaseTexasDue Aug 20, 2026
- LC-3535 Sewer Line RepairsDue Sep 8, 2026
- Z--GATE-REPAIR C-LOT PUMP STATION-SHUDue Aug 27, 2026