Civic AI
Civic AI
Procurement intelligence
SAM.gov75H70126R00030
Open

Rosebud Lift Station Construction

HEALTH AND HUMAN SERVICES, DEPARTMENT OF · SD
Response deadline
Jul 20, 2026
Due in 3 days
Date posted
Jul 14, 2026

Description

Amendment 2: Update the pump requirements. Refer to the SF-30 A02 Pump Specs RLSC. 1. The purpose of this amendment is to add a geotechnical repost from 300 feet away from the site. 2. Attachment J02a RB Geotech Report from 300 feet away is added. 3. All other terms and conditions remain unchanged. Amendment 2: Update the pump requirements. Refer to the SF-30 A02 Pump Specs RLSC. 1. The purpose of this solicitation amendment A02 is to: a. Update the pump requirements. 2. Attachment J03 Tech Specs RLSC, paragraph 2.4 Sewage Pumps, F. Pump Performance Requirements is amended as follows: - Item 1. Capacity is changed from 95 gpm to 125 GPM . - Item 3. Total Dynamic head is changed from 63 feet to 80 feet . 3. Remember to acknowledge all amendments. Block 11 of the SF-30 provides instructions for acknowledging amendments; it is acceptable to acknowledge on block 19 of the SF-1442. 4. All other terms and conditions remain unchanged. ---------------------------------------------------------------------------- Amendment 1: Add attachment J03a Plans RLSC and the corresponding SF-30. ---------------------------------------------------------------------------- Request For Proposals (RFP) Rosebud Lift Station Construction 75H70126R00030 Set-Aside: Total Small Business set-aside. Product Service Code: Y1ND - Construction of Sewage And Waste Facilities NAICS Code: 237110 - Water and Sewer Line and Related Structures Construction Size Stdr: $45 million Location: 1319 Soldier Creek Road, Rosebud, SD 57570 County: Todd POP: 240 calendar days Construction Magnitude: Between $500,000 and $1,000,000 Contract Type: firm-fixed-priced TERO: TERO is applicable. See Section H.50. Goal: The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration. This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system. Primary Point of Contact: Daniel Cotto Email: daniel.cotto@ihs.gov Phone Number: 2404617841 Alternative Point of Contact: (Please don't add unless the primary is unavailable.) Andrew E. Hart Email: andrew.hart@ihs.gov Phone Number: 206-375-4443 Attachments: Refer to the Attachments section.

Classifications

Documents (15)

  • J06 WH-347 Payrolls Exp 31Jan2028.pdf
    .pdf298 KBNot yet available
  • J02a RB Geotech Report from 300 feet away.pdf
    .pdf1.0 MBNot yet available
  • J05 Self Performed Calculation Sheet.docx
    .docx28 KBNot yet available
  • Optional Company Specialized Experience Form.pdf
    .pdf489 KBNot yet available
  • A02 Pump Specs RLSC.pdf
    .pdf183 KBNot yet available
  • A01 Add Attachment RLSC.pdf
    .pdf123 KBNot yet available
  • J04 Wage Det SD20260018 18May2026.pdf
    .pdf62 KBNot yet available
  • A03 Add Geotech Report from 300 fT Away RLSC.pdf
    .pdf125 KBNot yet available
  • J07 Release of Claims.docx
    .docx14 KBNot yet available
  • J02 Block 17 Support Schedule RLSC.docx
    .docx28 KBNot yet available
  • J03a Plans RLSC.pdf
    .pdf5.4 MBNot yet available
  • B01 RFP RLSC 75H70126R00030.pdf
    .pdf3.0 MBNot yet available
  • J01 SOW Rosebud Lift Station Construction.docx
    .docx37 KBNot yet available
  • Optional Past Performance Questionnaire.docx
    .docx30 KBNot yet available
  • J03 Tech Specs RLSC.pdf
    .pdf3.2 MBNot yet available

Contacts

Explore more