Civic AI
Civic AI
Procurement intelligence
SAM.gov73573
Open

Argon Piping Supply, Installation and Testing

ENERGY, DEPARTMENT OF · SD
Response deadline
Jul 27, 2026
Due in 26 days
Date posted
Jun 2, 2026

Description

As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC. This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above.

Classifications

  • NAICS236210
  • PSCY1JZ

Documents (17)

  • RFP Argon Piping R1 6.1.2026.docx
    .docx93 KB
    Download
  • J-10 South Dakota Wase Determinatin 20260016.txt
    .txt13 KB
    Download
  • J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdf
    .pdf314 KB
    Download
  • K-4 FL-57B (Rev. 1-07).pdf
    .pdf22 KB
    Download
  • K-3 FL-11_Rev1.pdf
    .pdf332 KB
    Download
  • J-7 014100-8-2025-South Dakota Quality Requirements.pdf
    .pdf331 KB
    Download
  • J-4 SDSTA Risk Transfer Protocol Manual Final July 12 2024.pdf
    .pdf3.4 MB
    Download
  • J-5 010010_General_Requirements_SD_4_2025_FFDG.docx
    .docx97 KB
    Download
  • J-3 Argon Piping Supply and Install SOW (2).docx
    .docx4.2 MB
    Download
  • J-1 FFDG General Terms and Conditions for Construction at SURF (08.2025).pdf
    .pdf327 KB
    Download
  • K-2 SARC_Subcontractor Annual RepsCerts Rev 4.pdf
    .pdf362 KB
    Download
  • J-9 FL-55 Small Business Subcontracting Plan (Rev. 6-23) 14.0 - Exhibit III-G.pdf
    .pdf392 KB
    Download
  • 1. RFP Letter 6.1.2026 R1.docx
    .docx49 KB
    Download
  • K-1 PUR-466_Proposal Certifications-.pdf
    .pdf402 KB
    Download
  • J-6 013100_7-31-2025 FermiForward_South_Dakota.pdf
    .pdf1.3 MB
    Download
  • J-11 Price Sheet including Fully Burdened Hourly Rate.xlsx
    .xlsx13 KB
    Download
  • J-6.1 7010_F1_Fermilab Subcontractor Safety Information Questionnaire.docx
    .docx42 KB
    Download

Contacts

Explore more