sc_scbo1-2026
Open
Pre-Demolition Asbestos and Hazardous Materials Survey
- Response deadline
- Oct 16, 2026 Due in 0 days
- Date posted
- Oct 6, 2026
- Source
- Open notice
Description
Identify, locate, and quantify other hazardous, toxic, universal-waste, or otherwise regulated materials that must be removed and managed separately before or during demolition. Deliver a written report, signed and sealed by the licensed inspector of identified toxic materials. Provide one electronic (PDF) copy and two bound hard copies. The report shall be suitable for inclusion in public bid documents without redaction. Full details: https://cmeoc-my.sharepoint.com/:b:/g/personal/sdbass_cmeoc_org/IQDZ7WCP1jRrRJh9aBhrTpSSAYDsv1bIbSaB1t-DXzKV3vU?e=cUEmgB External link: https://cmeoc-my.sharepoint.com/:b:/g/personal/sdbass_cmeoc_org/IQDZ7WCP1jRrRJh9aBhrTpSSAYDsv1bIbSaB1t-DXzKV3vU?e=cUEmgB
Documents
No documents posted for this opportunity.
Contacts
- sdbass@cmeoc.org843.320.2114
Similar contracts
- Head Start Facility Project ManagerSCDue Oct 14, 2026