Lower Reedy WRRF Streambank Stabilization RFB
Renewable Water Resources (ReWa) · SC
- Response deadline
- Jul 28, 2026 Due in 10 days
- Date posted
- Jul 14, 2026
- Source
- Open notice
Description
ReWa is accepting bids for the Lower Reedy WWRF Streambank Stabilization project that includes restoration and stabilization of an eroded section of streambank along the Reedy River adjacent to existing sanitary sewer infrastructure. Work includes removal of existing structures and debris, installation of approximately 194 LF of boulder toe wall and two in-stream boulder vanes, grading and restoration of the washed-out bank, and implementation of sediment and erosion control measures. Full details: https://rewaonline.org/for-business-and-industry/vendors External link: https://rewaonline.org/for-business-and-industry/vendors