JB Charleston Generator Monitoring System
- Response deadline
- Jul 27, 2026 Closed
- Date posted
- Jul 12, 2026
- Source
- Open notice
Description
Joint Base Charleston is seeking manufactures of remote generator monitoring systems and associated services. See attachments for specifics. This project will procure and install a remote monitoring system for 65 generators across Joint Base Charleston's four geographically separated locations. This system is a data acquisition platform and will be integrated into the existing EMCS architecture, providing instant, centralized notification of any electrical or generator failures. This directly enhances base resiliency by replacing slow, manual inspection processes with real-time situational awareness, allowing for rapid response to power disruptions and ensuring mission continuity. The MP has provided that 18 generator systems have confirmed communication capability compatible with Monico integration. An additional 7 units are believed to be compatible but require additional discovery and confirmation. Approximately 40 units have been identified as older Cummins generators which may or may not currently have the required Cummins network cards and commissioned Cummins ProtoNode gateways installed and operational.
Classifications
Documents (2)
- Minimum Characteristics Remote Generator Monitoring.docx.docx236 KBNot yet available
- JBC Gen data.xlsx.xlsx18 KBNot yet available
Contacts
- jeffrey.krieger@us.af.mil8439634547
- roger.crews@us.af.mil8439633568
Similar contracts
- VDATS Rohde & Schwarz Repair Blanket Purchase Agreement (BPA)GeorgiaDue Oct 23, 2026
- Continuation of service for Maintenance Service Agreement for Hardware/Software of Antenna RangesDue Oct 16, 2026
- Vacuum Turbo PumpsDue Nov 13, 2026
- Generator, SignalDue Oct 28, 2026
- Indicator, Fault LocatiDue Oct 28, 2026
- Keysight Network AnalyzerCaliforniaDue Oct 19, 2026