ri_dopTCB26006498
Open
Corridor - Ashaway
- Response deadline
- Aug 28, 2026 Due in 28 days
- Date posted
- Jul 31, 2026
- Source
- Open notice
Description
This project consists of 3 bridge replacements. They include Bridge No. 005051 (butted box beam), Bridge No. 005151 (concrete arch), and Bridge No. 005251 (butted box beam). All bridges are over bodies of water. The bridges were built between 1928 and 2002 with several rehabilitations performed as recently as 2019. All the bridges have a bituminous wearing surface. The bridge inspection reports, photos, utility information, and other attached documents provide additional information about the individual bridges.
Documents (7)
- Federal Wage Rates 5-18-2026.pdfapplication/pdf71 KBNot yet available
- 2026_February_Standard_Specifications.zipapplication/x-zip-compressed122.0 MBNot yet available
- RIDOT_Required_Forms_Federal.pdfapplication/pdf737 KBNot yet available
- 2026-CB-019_Plan_File_V1.pdfapplication/pdf39.5 MBNot yet available
- 2026-CB-019_Plan_File_V2.pdfapplication/pdf42.4 MBNot yet available
- 2026-CB-019-Corridor-Ashaway_JS_Pages.pdfapplication/pdf1.9 MBNot yet available
- 2026-CB-019-Corridor-Ashaway_CS_Pages.pdfapplication/pdf68.0 MBNot yet available
Contacts
Similar contracts
- RIC Campus Shuttle ServicesRIDue Aug 7, 2026
- MPA 589 PK-12 School Redesign and Strategic Support ServicesRIDue Jul 7, 2028
- MPA 620 - Marine Craft Service, Repair and MaintenanceRIDue Sep 30, 2027
- DEM Reservation and Registration Management SystemRIDue Aug 13, 2026
- DOA Auditing Services - Tobacco Settlement Financing CorporationRIDue Jul 29, 2026
- DCYF Youth Development Support (YDS) ServicesRIDue Jul 30, 2026