Reynosa IT Wiring
- Response deadline
- Sep 23, 2026 Due in 14 days
- Date posted
- Sep 9, 2026
- Source
- Open notice
Description
Reynosa IT Wiring POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov The implementation of 62 data points and the installation, labeling, certification, and documentation of a complete Cat 6 Structured Cabling System. Preparation of "as-built" drawings and technical reports necessary for the design and installation Removal of all previously installed cabling, so that only the cabling that is the subject of this call remains. Magnitude of Construction: Between $25,000 and $100,000. NAICS Code: 238210 Organized Site Visit Date And Time: 8/12/2026 10:00 AM Location: USDA APHIS IS Reynosa Carretera Reynosa a Matamoros KM79, Brecha 102 Reynosa POC: Paloma Butron, paloma.j.butron@usda.gov ALL INTERESTED VENDORS MUST CONTACT THE POC LISTED ABOVE BY 8/10/2026 AS THEY MUST GET AUTHORIZATION PRIOR TO THE SITE VISIT Attachment 1 SOI Attachment 2 SOW Attachment 3 Plans All questions must be submitted via email by 12:00 PM Central Time on 8/192026 to Erick Plamann, Contract Specialist, erick.plamann@usda.gov. NO OTHER MEANS WILL BE ACCEPTED. All offers must be submitted via email by 12:00 PM Central Time on 9/42026 to Erick Plamann, Contract Specialist, erick.plamann@usda.gov. NO OTHER MEANS WILL BE ACCEPTED. EXTENDED TO 9/23/2026.
Classifications
Documents (5)
- C04_Attachment 3 Plans.pdf.pdf131 KBNot yet available
- C04_Attachment 1 SOI.pdf.pdf41 KBNot yet available
- 12639526Q0256.pdf.pdf404 KBNot yet available
- C04_Attachment 2 SOW.docx.docx21 KBNot yet available
- 12639526Q0256 A0001.pdf.pdf86 KBNot yet available
Contacts
Similar contracts
- Audio Visual Equipment Installation New SATCOM FacilityOkinawaDue Sep 15, 2026
- FY26 LSS Cubicles electrical and IT wiring in CCRU FacilityWisconsinDue Sep 22, 2026
- Cable Fiber Install ATC Tower Dobbins ARBGeorgiaDue Sep 18, 2026
- CSS 99154 Upgrade Existing Lighting to LEDDue Sep 15, 2026
- D--NETWORK CABLING InstallationDue Sep 14, 2026
- Bulkhead Crane Bus Rails Replacement at Captain Anthony Meldahl Locks and DamDue Sep 21, 2026