SAM.gov140P5426R0016
Open
Replace Backflow Preventer on Lighthouse Road at C
- Response deadline
- Aug 4, 2026 Closed
- Date posted
- Jul 6, 2026
- Source
- Open notice
Description
REPLACE BACKFLOW PREVENTER ON LIGHTHOUSE ROAD AT CAPE HATTERAS NATIONAL SEASHORE
Classifications
Documents (4)
Contacts
Similar contracts
- Install Sewer Lift Station Pumps and Controls, Stoneville, MississippiMississippiDue Sep 15, 2026
- NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American LakeDue Sep 11, 2026
- Yellowstone - Mammoth Water Line ReplacementDue Sep 15, 2026
- Y--2026 Marcott Coulee PipelineDue Sep 10, 2026
- MAHG251029 Repair Water Tower #8MississippiDue Sep 15, 2026
- Norwood Horse Pasture WellColoradoDue Sep 22, 2026