Repairs to Fire Suppression Tank Rich
- Response deadline
- Sep 21, 2026 Closed
- Date posted
- Sep 2, 2026
- Source
- Open notice
Description
PROCUREMENT TYPE: The Government anticipates awarding a single firm-fixed price contract to meet this requirement. This firm-fixed price contract will be awarded using RFO FAR 12.203 and, the Lowest Price Technically Acceptable process as defined in FAR 15.101-2 shall be used in the requirement as authorized by RFO FAR 12.203 (c)(3). Accordingly, we are requesting you review the information within the solicitation and attachments. SET-ASIDE: This acquisition will be a 100% Total Small Businesses (SB) Set-aside. Offers will only be accepted from small businesses. Offers received from concerns that are not SB concerns shall be considered nonresponsive and will be rejected. NORTH AMERICAN INDUSTRIAL CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD: The NAICS code for this project is 238220 Plumbing, Heating, and Air-Conditioning Contractors and the small business size standard is $19 million. WAGE RATES: Davis Bacon General Wage Decision Number: VA20260007, Richmond County, Virginia; Construction Type: Building DURATION: The contract performance period is expected to be 90 calendar days from notice to proceed; the period of performance is negotiable. SITE VISIT: An organized site visit has not been scheduled. For firms interested in attending a site visit, must submit name to Mike_Fiasco@nps.gov.
Classifications
Documents (7)
- Attachment_3_-_Wage_Determination__VA20260007.pdf.pdf147 KBNot yet available
- Attachment_2_-__RICH__Fire_Tank_Drawings.pdf.pdf5.4 MBNot yet available
- Sol_140P4226R0031.pdf.pdf971 KBNot yet available
- Attachment_5_-_Certifications_From_Section_K.docx.docx88 KBNot yet available
- Attachment_6_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx.xlsx160 KBNot yet available
- Attachment_4_-__Technical_Capability_Submittals.docx.docx45 KBNot yet available
- Attachment_1_-__RICH_FS_Tank_SPECS.pdf.pdf6.6 MBNot yet available
Contacts
- wendy_deleon@nps.gov6175994957
Similar contracts
- Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228IllinoisDue Oct 20, 2026
- TVHS AC VRF System InstallationTennesseeDue Oct 23, 2026
- Troubleshoot & Repair of Portable Chillers Service RequirementTexasDue Oct 22, 2026
- Cooling Water System Repair and Reliability ProjectDue Oct 26, 2026
- FY 2026 Preventive Maintenance Services to the Building Automation SystemEstuaireDue Oct 19, 2026
- Trane BAS HVAC Control System Inspection, Maintenance, Upgrades, and RepairWYDue Oct 28, 2026