Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota
- Response deadline
- Aug 27, 2026 Due in 1 day
- Date posted
- Aug 26, 2026
- Source
- Open notice
Description
Amendment 0003 = 1. Revise Section 00 21 00, paragraph 8. 2. Revise Section 00 22 00, paragraph 1. 3. Remove 52.242-4 Final indirect cost rates Offers will be received until 10:00 am Central 27 August 2026. Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs 340ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.
Classifications
Documents (2)
- attachmentNot yet available
- Contractors who attended site visit 7.30.26.pdf.pdf71 KBNot yet available
Contacts
Similar contracts
- Pisgah North Ranger District Ditch Culvert Replacements and Road ReconditioningNorth CarolinaDue Sep 11, 2026
- B6229 Lot Expansion -JBSA-Bullis, TX 78257Due Sep 1, 2026
- NEW IDIQ - CONCRETE AND GRAVEL IDIQ FY26-29 Due Sep 8, 2026
- Repairs to Base Roads and Parkings, 156th WG Muñiz ANGBPuerto RicoDue Sep 8, 2026
- Solicitation is Restricted to the Region 5 FERM BPA HoldersCaliforniaDue Sep 15, 2026
- Pisgah South Culvert RehabNorth CarolinaDue Sep 8, 2026