Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota
- Response deadline
- Aug 27, 2026 Due in 16 days
- Date posted
- Aug 11, 2026
- Source
- Open notice
Description
Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5 ft narrower than the western half south of the MPA centerline taxiway (335 ft vs 340ft). This project will establish a uniform MPA width of 340 ft south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2 drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.
Classifications
Documents (2)
- attachmentNot yet available
- DownloadContractors who attended site visit 7.30.26.pdf.pdf71 KB
Contacts
Similar contracts
- Asphalt Repairs Bldg 905, 916, PP201, LCH4930, AS211, & AS214North CarolinaDue Aug 20, 2026
- FY26 Multiple Location BEQ Parking Lot RepairsNorth CarolinaDue Aug 19, 2026
- Airfield Civil Works IDIQDue Aug 26, 2026
- NFSR 24 Stabilization and PreservationArizonaDue Sep 14, 2026
- RR24-RR44 Sidewalk Repairs and MCASNR MTI Reflector Towers Concrete PadsNorth CarolinaDue Aug 31, 2026
- Rubber Removal & Paint Striping – Indefinite Delivery, Indefinite Quantity (IDIQ) FY27South CarolinaDue Aug 26, 2026