Civic AI
Civic AI
Procurement intelligence
SAM.govW9128F26RA107
Open

Repair/Replace Mass Parking Apron Section V at Minot AFB North Dakota

DEPT OF DEFENSE
Response deadline
Date posted
Jun 9, 2026

Description

On or about 25 June 2026, the Government intends to issue a solicitation for Repair/Replace Mass Parking Apron Section V at Minot Air Force Base, Minot, North Dakota. The solicitation will close after 30 days. The solicitation is restricted to Small Businesses. Project Description: This project will be executed using a design-bid-build project delivery method. The entire Mass Parking Apron will be removed and replaced in multiple sections over the course of several years. The existing MPA was originally constructed under two separate contracts. For unknown reasons, the first constructed eastern half is 5? narrower than the western half south of the MPA centerline taxiway (335? vs. 340?). This project will establish a uniform MPA width of 340? south of the MPA centerline taxiway. Due to slight changes in finished top of pavement grades between the new MPA Section(s) pavement and the existing MPA pavement to remain, a new temporary ACC transition will be required to connect new MPA Section(s) PCC pavement to existing MPA PCC pavement. Limited grading of turf areas adjacent to new ACC shoulder pavement to improve surface drainage away from paved shoulder edges (Provide 1-1/2? drop-off at edge per UFC 3-260-01, Chapter 6). Existing asphalt shoulders required to be removed will be milled by the Contractor and stockpiled for Minot AFB use at a later date at the location shown on the drawings. Estimated Construction Costs: The estimated construction cost of this project is between $25,000,000 and $35,000000.

Classifications

Documents (1)

  • attachment
    Not yet available

Contacts

Explore more