SAM.govW91QVN26QA019
Open
Repaint exterior surfaces of control tower for building S-1284 at USAG Humphreys
- Response deadline
- Jun 4, 2026 Closed
- Date posted
- Jun 1, 2026
- Source
- Open notice
Description
Construction for Repaint exterior surfaces of control tower for building S-1284 at USAG Humphreys, Amendment 0001: Block 10.D CONTRACT PRICE RANGE: THE ESTIMATED PRICE RANGE OF THIS PROJECT IS BETWEEN $25,000 to $100,000., Amendment 0002: Add overspay containment method. Amendment 0003: Provide clear instruction to all prospective vendors. As a result of this amendment, all prospective offerors, including those who have already submitted a quotation, are granted the opportunity to submit a new or revised quotation.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Repair Outdoor Switchgear Cabinets, Beacon Hill, S-1459 at USAG HumphreysDue Sep 10, 2026
- Vault Door Replacement, Building 4215, 2DLAADNorth CarolinaDue Aug 25, 2026
- BUILDING LF-18 JFK RESTROOMS RENOVATIONDue Aug 31, 2026
- Misawa AB - Membrane Storage Shelters - Design-BuildAomoriDue Sep 11, 2026
- GAOA High Sierra Ranger Station Upgrades, Sierra National ForestCaliforniaDue Sep 23, 2026
- Building 36000 2nd Floor Reconfiguration to Conference SpaceTexasDue Sep 3, 2026