POL, PPS, AASF Concord-Fuel System Repairs
- Response deadline
- Oct 6, 2026 Due in 15 days
- Date posted
- Sep 21, 2026
- Source
- Open notice
Description
****This is a pre solicitation notice only and includes a draft Scope of Work.This project includes replacing the grounding and high-level shut-off valves for both F-24 tanks (Tank 1 and Tank 2), extending the tank catwalk platform, and installing a check valve on the relief discharge into Tank 2. Additionally, the scope involves installing a truck offload meter, a visual fuel flow indicator, an eyewash station, and a filter separator maintenance platform for the truck offload/fillstand, while providing integrated truck overfill prevention and ground verification systems. To complete the facility upgrades, the project also incorporates all necessary work to install protective pipe bollards for the offload/fillstand, replace the equipment shelter ground system, provide a ground verification system for offload operations, and execute the complete supply, installation, and testing of the Automatic Tank Gauging (ATG) system on fuel storage tanks 1 and 2.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Fort Hood Tank Repairs PresolicitationDue Oct 1, 2026
- 117 Fuel Tank RemovalAlabamaDue Sep 23, 2026
- Add Fuel Hydrant at Pumphouse 3 and 4, US NAVSUPPACT Andersen AFB, GuamGuamDue Sep 24, 2026
- Fuel Tank Removal and Replacement, Colebrook River Lake, Colebrook, CTConnecticutDue Sep 22, 2026
- ID-CAMAS NWR- Fuel Tanks WiringDue Oct 8, 2026
- DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, JapanDue Jan 25, 2027