SAM.govF3KTK76106AW02
Open
Pillow Block Plates
- Response deadline
- Aug 27, 2026 Due in 8 days
- Date posted
- Aug 19, 2026
- Source
- Open notice
Description
Pillow Block Plates must be manufactured in accordance with the drawings, specifications, and tolerances described in (Acceptance Plan). A First Article requirement will be used to ensure the manufactured items conform to the specified contract requirements. Requirements: 25 Pillow Block Plates
Classifications
Documents (4)
- Pillow Block Plates - Drawings 8-12-26.pdf.pdf3.2 MBNot yet available
- Solicitation - FA830726QB057.pdf.pdf612 KBNot yet available
- Statement of Objectives.docx.docx85 KBNot yet available
- FA830726QB057 - Pillow Block Plates - Acceptance Plan.docx.docx17 KBNot yet available
Contacts
Similar contracts
- Skin, Cabin LWR RH ADue Aug 20, 2026
- FUEL CELL,AIRCRAFT,Due Sep 21, 2026
- VALVE, PRESSURE REGDue Sep 4, 2026
- FUEL CELL,AIRCRAFT,Due Sep 21, 2026
- 17--MAINTENANCE PLATFORDue Sep 21, 2026
- 16--GPP MODULE, IN REPAIR/MODIFICATION OFDue Sep 21, 2026