Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution, Pool 1, Enterprise Facility Modernization, EDC Equipment Modernization
- Response deadline
- —
- Date posted
- Sep 29, 2026
- Source
- Open notice
Description
In accordance with FAR 6.302-1, the Defense Logistics Agency (DLA) anticipates issuing modifications to existing EDC Modernization Delivery Order SP3300-20-F-1300 on a sole source basis to Advantaged Solutions, Inc. for additional software development due to design gaps, and additional OCM support. Advantage Solutions Inc. has a general contractor on site to make modifications to the facility, to include the requirements listed above. Awarding to another vendor would add unwarranted complexity to the integration of systems. Additional vendors would require them to mobilize multiple times at an increased cost. ASI is already contracted to perform the installation and integration requirements listed above, which need to be appropriately coordinated for the work to be performed. In accordance with FAR 6.302-1, Advantage Solutions, Inc. is the only responsible source capable of providing these requirements at this time. The J&A for the modifications are being posted as part of this notice. This is not a solicitation for proposals or an invitation for bids. The Government does not anticipate receiving responses to this notice of a non-competitive action.
Classifications
Documents (2)
- MFR - Sole Source Justification DG27 Redacted.pdf.pdf296 KBNot yet available
- JA estops catwalk Design gaps golive shift FSS CARedacted.pdf.pdf569 KBNot yet available
Contacts
- joshua.woodworth@dla.mil6146939845
- melanie.l.morris@dla.mil6146935405
Similar contracts
- Actuator, Electro-MechaDue Oct 13, 2026
- Edwards AFB Storage Aid SystemDue Sep 30, 2026
- Sources Sought Replacement of Elevating Transfer Vehicles - Ramstein Air Base, GermanyDue Nov 9, 2026
- Edwards AFB Storage Aid SystemDue Sep 30, 2026
- Mechanized Material Handling System at Travis AFB, CaliforniaDue Oct 19, 2026
- Kardex Megamat Rs350 Vertical Carousel Module, or EqualGeorgiaDue Sep 21, 2026