WWTP SBR 1 & Digester Rehabilitation
- Response deadline
- Jun 30, 2026 Closed
- Date posted
- May 28, 2026
- Source
- Open notice
Description
THIS PROJECT DOES NOT REQUIRE YOU TO STOP AT THE VISITORS CENTER TO GAIN ACCESS. THE WASTE WATER TREATMENT PLANT IS LOCATED OUTSIDE THE GATES. This PROJECT IS A STANDARD LOW BID PROJECT and includes: GENERAL CONSTRUCTION The work under this Contract shall generally consist of but is not limited to providing all labor, material, devices, tools and equipment required for the replacement of existing treatment equipment and application of protective coating system to concrete surfaces in SBR #1 and Digester #1 at the Fort Indiantown Gap Wastewater Treatment Plant. All Work shall be in accordance with the specifications and drawings and subject to the terms and conditions of all other Contract Documents. ESTIMATED RANGE: General Construction - $2,000,001.00 - $3,000,000.00 Liquidated Damages: General Construction - $750.00 per day MANDATORY PRE-BID CONFERENCE: The Pre-Bid Conference will take place on Thursday June 4, 2026, at 10:00AM at the Waste Water Treatment Plant - Building 4-174 (map attached in bid documents), Fort Indiantown Gap, Annville, Lebanon County, PA. ALL POTENTIAL BIDDERS MUST BE PRESENT TO SUBMIT A BID SUBMISSION. Questions are due back by COB 4:30PM EST on June 18, 2026. Bids are due by Tuesday June 30, 2026, by 2:00PM TBD: The Department of General Services Public Works and the Business Inclusion and Supplier Development (BISD) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction – SDB = 19% VBE = 3% BIDS FOR THIS PROJECT WILL ONLY BE ACCEPTED ELECTRONICALLY THROUGH WWW.PASUPPLIERPORTAL.STATE.PA.US. Any questions with the PA Supplier Portal must go through the Help Desk at 877-435-7363.
Documents (17)
- Download42250065_SBR 1 and Digester 1 Rehab_Drawings.pdfapplication/pdf4.5 MB
- Download42250065_SBR 1 and Digester 1 Rehab_Spec.pdfapplication/pdf688 KB
- DownloadAddendum #1.docxapplication/msword53 KB
- Download6100066141 WWTP SBR 1 & Digester Rehabilitation BDISBO SDB VBE presentation.pdfapplication/pdf3.1 MB
- DownloadAddendum #2.docxapplication/msword53 KB
- DownloadSKM_4750i26060508020.pdfapplication/pdf156 KB
- DownloadAddendum #3.docxapplication/msword53 KB
- DownloadAddendum #4.docxapplication/msword53 KB
- DownloadRFI's.docxapplication/msword73 KB
- DownloadAdministrative Procedures 2023 DMVA.docxapplication/msword174 KB
- DownloadBid docs to be returned.pdfapplication/pdf2.8 MB
- DownloadGeneral Conditions to the Construction Contract DMVA 2024 v6.docxapplication/msword235 KB
- DownloadInstructions to Bidders DMVA - 2024.docxapplication/msword69 KB
- DownloadNotice to Bidders.docxapplication/msword19 KB
- DownloadPre-bid location map.pdfapplication/pdf204 KB
- DownloadRequest for Information.docxapplication/msword18 KB
- DownloadWage Rates.pdfapplication/pdf653 KB
Contacts
- Tina Rebucktrebuck@pa.gov717-861-8794