Civic AI
Civic AI
Procurement intelligence
pa_emarketplaceDGS C-0509-0040 Phase 1
Open

Southeast Psychiatric Treatment Center at Norrist

Response deadline
Dec 31, 2099
Due in 26783 days
Date posted
Apr 24, 2026

Description

This PROJECT IS A STANDARD LOW BID PROJECT and includes GENERAL, HVAC, PLUMBING AND ELECTRICAL CONSTRUCTION. ***This procurement is now stayed by Order of Commonwealth Court until further Order of Court. Disregard the Solicitation Due Date below as this date will be revised by addendum if/when necessary. *** PROJECT TITLE: Southeast Psychiatric Treatment Center at Norristown State Hospital ESTIMATED RANGE: .1A - Site Work – $22,000,000 - $23,000,000 .1B - Structural Steel – $20,000,000 - $21,000,000 .1C – Concrete – $14,000,000 - $15,000,000 .1D - Masonry/Stone – $12,000,000 - $13,000,000 .1E - Exterior Glass/Glazing – $17,000,000 - $18,000,000 .1F - Flooring – $3,000,000 - $4,000,000 .2 - HVAC – $50,000,000 - $51,000,000 .2A - Sheet Metal – $26,000,000 - $27,000,000 .3 - Plumbing – $22,000,000 - $23,000,000 .4 - Electrical – $61,000,000 - $62,000,000 .4A - Site Electrical – $10,000,000 - $11,000,000 .5 - Fire Protection – $6,000,000 - $7,000,000 .6 - Elevator – $2,000,000 - $3,000,000 LIQUIDATED DAMAGES = (.1A) $7,000 per day, (.1B) $7,000 per day, (.1C) $5,000 per day, (.1D) $5,000 per day, (.1E) $6,000 per day, (.1F) $2,000 per day, (.2) $12,500 per day, (.2A) $8,000 per day, (.3) $7,000 per day, (.4) $13,000 per day, (.4A) $5,000 per day, (.5) $3,000 per day, (.6) $1,500 per day, There is no Bid Guaranty required for this Project. DATE FOR RECEIVING BIDS will be revised by addendum if/when necessary. The Department of General Services Capital Programs and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $600,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Capital Programs. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 – General Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 6% VBE = 3% .1A – Site Work Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 13% VBE = 3% .1B – Structural Steel Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .1C – Concrete Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .1D - Masonry/Stone Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 17% VBE = 3% .1E - Exterior Glass/Glazing Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .1F - Flooring Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .2 - HVAC Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .2A - Sheet Metal Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 10% VBE = 3% .3 - Plumbing Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .4 - Electrical Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 13% VBE = 3% .4A - Site Electrical Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 13% VBE = 3% .5 - Fire Protection Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = 9% VBE = 3% .6 - Elevator Construction ALL BASE BIDS (#1, #2, #3 & #4) SDB = NA VBE = NA All proposers must be registered to view/download Plans and Specifications and must have a Current, Active Vendor Number. To register click the following link: register All Proposers are required to create a user profile within Trimble Unity Construct. Please click on discipline below to create a user profile and view the bid package: Site Work Construction Structural Steel Construction Concrete Construction Masonry/Stone Construction Exterior Glass/Glazing Construction Flooring Construction HVAC Construction Sheet Metal Construction Plumbing Construction Electrical Construction Site Electrical Construction Fire Protection Construction Elevator Construction

Documents (1)

  • 509-0040 Phase 1 - Low Bidder Additional Informational Flyer.docx
    application/msword18 KB
    Download

Contacts

Similar contracts

Explore more