Construct ERHM Infrastructure Upgrades - University Drive - Pittsburgh, PA
- Response deadline
- Jul 24, 2026 Due in 7 days
- Date posted
- Jun 17, 2026
- Source
- Open notice
Description
The scope of work shall generally consist of but is not limited to the following: construction work to facilitate all modifications at multiple existing buildings on the VAPHS University Drive VA campus to upgrade the infrastructure to support the new Electronic Health Records Modernization (EHRM) system. The upgrade to the infrastructure will be campus wide buildings impacted to include Buildings 1, 5, 8, 29, 30, 33, and site. The architectural total existing space square footage affected is approximately 3,030 SF with new tower addition square footage of 11,600 SF. Upgrades for these buildings will include the construction of new towers, existing rooms and telecommunication closets and include relocation, reconfiguration, expansion, and renovation involving new walls, doors and finishes, etc. throughout each space.
Classifications
Documents (7)
- DownloadS02 - Att2 - Drawings 1of3.pdf.pdf39.9 MB
- DownloadS02 - Att5 - Wage Determination.txt.txt24 KB
- DownloadS02 - 36C77626R0082_1.pdf.pdf914 KB
- DownloadS02 - Att1 - Specifications.pdf.pdf11.2 MB
- DownloadS02 - Att4 - Drawings 3of3.pdf.pdf47.9 MB
- DownloadS02 - Att6 - SOW.pdf.pdf228 KB
- DownloadS02 - Att3 - Drawings 2of3.pdf.pdf44.7 MB
Contacts
- Benjamin Niznik - Contract Specialist
- Samantha Mihaila - Contracting Officer