SAM.gov47PC5126C0012
Open
Byrne Service Elevator Design Refresh & CA Services
GENERAL SERVICES ADMINISTRATION · PA
- Response deadline
- —
- Date posted
- Jun 22, 2026
- Source
- Open notice
Description
The services to be performed include a design refresh and Construction Administration Services, Phase 1 through Phase 4, of a project using specifications and drawings signed and sealed by Henry Adams.
Classifications
Documents (1)
- DownloadJustification for OTFAO Comp 03 03 2026 Redacted.pdf.pdf136 KB
Contacts
- Erin Watson