Area 8 & 13 Waterline Project
- Response deadline
- Jul 1, 2026 Closed
- Date posted
- May 27, 2026
- Source
- Open notice
Description
FORT INDIANTOWN GAP IS NOW ACCESS CONTROLLED. PLEASE MAKE SURE YOU HAVE A CURRENT DRIVERS LICENSE, PASSPORT, ETC. FOR IDENITY PROOFING. YOU MUST STOP AT THE VISITORS CENTER TO OBTAIN A DAY PASS THAT WILL ALLOW YOU ON BASE THE DAY OF THE SITE VISIT. IF YOU HAVE ANY QUESTIONS, PLEASE EMAIL ME AT TREBUCK@PA.GOV. This PROJECT IS A STANDARD LOW BID PROJECT and includes: GENERAL CONSTRUCTION The work under this Contract shall generally consist of, but not necessarily be limited to, providing all labor, material, devices, tools and equipment required for the installation of approximately 3,700 LF (Area 8) and approximately 12,000 LF (Area 13) of new 10”, 8”, 6”, & 4” watermain, fire hydrants, valves, tie ins, & service laterals and curb stops located in Fort Indiantown Gap and shall be in total accordance with the specifications and drawings and subject to the terms and conditions of all other Contract Documents. ESTIMATED RANGE: General Construction - $2,000,001.00 - $3,000,000.00 ESTIMATED RANGE: Liquidated Damages: General Construction - $750.00 per day MANDATORY PRE-BID CONFERENCE: The Pre-Bid Conference will take place on Wednesday June 10, 2026, at 10:00AM at Building 11-64 Conference Room (map in bid docs), Lebanon County, PA. ALL POTENTIAL BIDDERS MUST BE PRESENT TO SUBMIT A BID SUBMISSION. Questions are due back by COB 3:30PM EST on June 19, 2026. DATE FOR RECEIVING BIDS IS July 1, 2026, by 2:00P.M. The Department of General Services Public Works and the Office of Business Inclusion and Supplier Development (BISD) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction – SDB = 16.0% VBE = 3.0% BIDS FOR THIS PROJECT WILL ONLY BE ACCEPTED ELECTRONICALLY THROUGH WWW.PASUPPLIERPORTAL.STATE.PA.US. Any questions with the PA Supplier Portal must go through the Help Desk at 877-435-7363.
Documents (16)
- Download42250042-42110320_AREA 8&13_WATERLINE_DWGS-BID.pdfapplication/pdf14.3 MB
- Download42250042-42110320_AREA 8&13_WATERLINE_SPECS-BID.pdfapplication/pdf709 KB
- DownloadAddendum #1.docxapplication/msword53 KB
- Download6100066090 Area 8 & 13 Waterline Project BDISBO SDB VBE presentation.pdfapplication/pdf3.0 MB
- DownloadAddendum #2.docxapplication/msword53 KB
- DownloadPre-bid sign in sheet.pdfapplication/pdf312 KB
- DownloadAddendum #3.docxapplication/msword53 KB
- Download2026-06-22_42250042-42110320_area8and13water__Pre-Bid RFI Log.pdfapplication/pdf90 KB
- DownloadAdministrative Procedures 2023 DMVA.docxapplication/msword174 KB
- DownloadBid docs to be returned.pdfapplication/pdf2.7 MB
- DownloadGeneral Conditions to the Construction Contract DMVA 2024 v6.docxapplication/msword235 KB
- DownloadInstructions to Bidders DMVA - 2024.docxapplication/msword69 KB
- DownloadNotice to Bidders.docxapplication/msword19 KB
- DownloadPre-bid map location.pdfapplication/pdf222 KB
- DownloadRequest for Information.docxapplication/msword18 KB
- DownloadWage Rates.pdfapplication/pdf653 KB
Contacts
- Tina Rebucktrebuck@pa.gov717-861-8794