AMRP, Smith Corners, Clinton Twp, Venango Cty
- Response deadline
- Jun 4, 2026 Closed
- Date posted
- May 8, 2026
- Source
- Open notice
Description
Principal Items of Work and Approximate Quantities: Implementation of the Erosion and Sediment Pollution Control Plan – Rock Construction Entrance, 3 EACH Implementation of the Erosion and Sediment Pollution Control Plan – Compost Filter Sock (32” Diameter), 4,650 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube,145 L.F. Clearing and Grubbing, 23.1 ACRE Grading – Grading Area 1, 24,450 C.Y. Grading – Grading Area 2, 141,209 C.Y. Grading – Grading Area 3, 13,626 C.Y. Grading – Ripping, 15.2 ACRE Planting – Planting Preparation, 23.1 ACRE Planting – Tree Seedlings, 10,345 EACH Planting – Grass Seed, 240 LB. Subsurface Drain, 1,990 L.F. Permanent Channel Excavation, 208 C.Y. Erosion Matting, 767 S.Y. Selective Grading, 200 ACRE Implementation of the Traffic Control Plan, 1 L.S. Beginning on the issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
Documents
No documents posted for this opportunity.