AMRP Murrinsville1&2 Venango&MarrionTWP ButlerCnty
- Response deadline
- Dec 10, 2026 Due in 27 days
- Date posted
- Nov 13, 2026
- Source
- Open notice
Description
The principal items of work and approximate quantities are: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 8,034 L.F. Implementation of the Erosion and Sediment Pollution Control Plan -Weighted Sediment Filter Tube, 260 L.F. Fence, 1,742 L.F. Clearing and Grubbing, 56.3 ACRE Brush Barrier, 3,900 L.F. Dewatering Impoundment, 1 L.S. Subsurface Drain, 3,083 L.F. Grading – Grading, 509,000 C.Y. Grading – Hummocky Piles, 19.5 ACRE Grading – Ripping, 15.9 ACRE Channel Excavation - Permanent Channel Excavation, 574 C.Y. Channel Lining - Erosion Matting, 1,432 S.Y. Planting – Planting Preparation, 56.3 ACRE Planting – Tree Seedlings, 24,072 EACH Planting – Grass Seed, 1,136 LB. Construction Surveying, 1 L.S. Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- AMR, Eagle Eye School E, Boggs Twp., Clearfield CnPADue Dec 10, 2026
- C&P 2 OG Wells, Forward Twp. White Oak, WestmorelPADue Jan 7, 2027
- DEP Decals Stickers and Cab CardsPADue Dec 3, 2026
- AMRP, Rocky Glen Pond, Moosic Bgh, Lackawanna CntPADue Dec 3, 2026
- AMR, N Liberty S, Multi CntyPADue Dec 3, 2026
- AMDAP, Shade Twp, Somerset CntyPADue Nov 19, 2026