The principal items of work and approximate quantities are: Implementation of the Erosion and Sediment Pollution Control Plan - Rock Construction Entrance with Wash Rack, 1 EACH Implementation of the Erosion and Sediment Pollution Control Plan - Compost Filter Sock (32” Diameter), 4,650 L.F. Implementation of the Erosion and Sediment Pollution Control Plan – Weighted Sediment Filter Tube, 40 L.F. Clearing and Grubbing – Clearing and Grubbing, 41.5 ACRE Grading - Grading, 401,000 C.Y. Grading – Hummocky Piles, 20 ACRE Grading – Ripping, 10.2 ACRE Pipe Installation - Twelve Inch (12") Pipe Installation, 46 L.F. Pipe Installation – Twenty Four Inch (24") Pipe Installation, 222 L.F. Pipe Installation - Thirty Inch (30") Pipe Installation, 422 L.F. Channel Excavation – Permanent Channel Excavation, 4,491 C.Y. Channel Lining – Erosion Matting, 11,223 S.Y. Gas Line Relocation, 1 INVOICE Planting – Planting Preparation, 41.5 ACRE Planting – Tree Seedlings, 20,536 EACH Planting – Grass Seed, 1,113 LB. Beginning on the Issue Date, free copies of bid documents can be obtained by going to www.BidExpress.com, PA Department of Environmental Protection.
Documents
No documents posted for this opportunity.
Contacts
Similar contracts
- Pssv Trtmnt Rehab Bellwd Res N Rde Twp Cmbria CntyPADue Sep 24, 2026
- C&P 8 OG Wells, Foster and Otto Twps. McKean CntyPADue Oct 15, 2026
- The Department of Environmental Protection (DEP), Bureau of Waste Management requires a contractor to provide staffing and operation of a Recycling Hotline (HotPADue Sep 12, 2026
- 35-X200997 FCS Tricorr CorrelatorPADue Sep 18, 2026
- 35X-190867 Tunable Diode Laser TDL-220PADue Sep 11, 2026
- Horizontal End Suction Chopper PumpsPADue Aug 27, 2026