SAM.gov69056726B000009
Open
OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
TRANSPORTATION, DEPARTMENT OF · Oregon
- Response deadline
- Oct 21, 2026 Due in 13 days
- Date posted
- Oct 8, 2026
- Source
- Open notice
Description
Update 10/8/2026: QA_10.8.2026.pdf posted to attachments. Invitation for Bids (IFB) for construction project OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead The Invitation for Bids (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are posted under attachments.
Classifications
Documents (6)
- Link to Bid OpeningNot yet available
- QA_10.8.2026.pdf.pdf185 KBNot yet available
- ora-dot-crgnsa100-7_plans.pdf.pdf50.0 MBNot yet available
- WFLHD Construction Contract Administration_FY 23 V2.pdf.pdf162 KBNot yet available
- IFB_69056726B000009_OR FLAP DOT CRGNSA 100(7).pdf.pdf50.0 MBNot yet available
- Physical Data.zip.zip50.0 MBNot yet available
Contacts
- wfl.contracts@dot.gov3606197520
Similar contracts
- Sidewalk Replacement Throughout Lyons CampusDue Oct 15, 2026
- Bonners Ferry Road GradingIdahoDue Oct 20, 2026
- Jake Rocks Road ReconstructionPennsylvaniaDue Oct 26, 2026
- Driveway & Parking Lot Sealcoating and StripingDue Oct 22, 2026
- Natchez Trace Parkway Project MS NP NATR 3F26MississippiDue Oct 20, 2026
- Z--Rdo_Tioga Bridge RehabilitationDue Oct 15, 2026