SAM.gov69056726B000009
Open
OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
TRANSPORTATION, DEPARTMENT OF · Oregon
- Response deadline
- Oct 21, 2026 Due in 33 days
- Date posted
- Sep 18, 2026
- Source
- Open notice
Description
Invitation for Bids (IFB) for construction project OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead The Invitation for Bids (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are posted under attachments.
Classifications
Documents (5)
- Link to Bid OpeningNot yet available
- ora-dot-crgnsa100-7_plans.pdf.pdf50.0 MBNot yet available
- WFLHD Construction Contract Administration_FY 23 V2.pdf.pdf162 KBNot yet available
- IFB_69056726B000009_OR FLAP DOT CRGNSA 100(7).pdf.pdf50.0 MBNot yet available
- Physical Data.zip.zip50.0 MBNot yet available
Contacts
- wfl.contracts@dot.gov3606197520
Similar contracts
- Repair Taxiway Alpha & Bravo - North Auxiliary AirfieldSouth CarolinaDue Oct 5, 2026
- Bonneville Lock and Dam - Navigation Lock 1 Bridge ReplacementOregonDue Oct 8, 2026
- New Fort Bliss Paving IDIQ ContractTexasDue Sep 24, 2026
- USDA Forest Service, Bitterroot National Forest, Selway Wilderness Suspension Trail Bridge Reconstruction ProjectIdahoDue Sep 28, 2026
- BRCA 310427 Southbound Shuttle StopDue Oct 19, 2026
- Caesar Creek Lake Dike Gravel OverlayOhioDue Sep 22, 2026