SAM.gov1240BE26Q0046
Open
Roadway vegetation maintenance services (842) for the Whitman Ranger District, Wallowa Whitman National Forest, Baker City, OR.
- Response deadline
- Jul 8, 2026 Closed
- Date posted
- Jun 2, 2026
- Source
- Open notice
Description
Roadway vegetation maintenance services (842) for the Whitman Ranger District, Wallowa Whitman National Forest, Baker City, OR. The scope of the scope of the work includes an estimated 55.8 miles with an additional 44.4 optional miles. See ATCH-2_PWS_1240BE26Q046: Performance Work Statement, Roadway vegetation maintenance services (842) for the Whitman Ranger District, Baker City, OR.
Classifications
Documents (6)
- DownloadA04. ATCH-02_PWS_1240BE26Q0026_WWNF.pdf.pdf222 KB
- DownloadC04. ANNEX A, WW Road Vegetation Maintenance Maps.pdf.pdf20.7 MB
- DownloadC04. ATCH-01_ Schedule-Pricing _1240BE26Q0046_WWNF.pdf.pdf170 KB
- DownloadC04. ATCH-4 Wage-Det_ 2015-5589 -31-03302026 - Oregon Eastern.pdf.pdf88 KB
- DownloadA07. ATCH-03-QASP_1240BE26Q0046_WWNF.pdf.pdf472 KB
- DownloadC04. SOL_1240BE26Q0046_WWNF.pdf.pdf333 KB
Contacts
Similar contracts
- WSMR Bridge Repair RR7B0003New MexicoDue Sep 8, 2026
- Improve Hamat RunwayDue Sep 14, 2026
- ZTL Childcare Facility Paving ProjectGeorgiaDue Sep 10, 2026
- Repair of Sergeant Major Boulevard at Fort Bliss, Texas.Due Sep 15, 2026
- Multiple Trail Bridges Replacement Project Phase 2GeorgiaDue Sep 8, 2026
- GOGA 319407 - Bridge PreservationDue Sep 14, 2026