REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE POINT/COLUMBIA RIVER; ASTORIA, OR
- Response deadline
- Aug 7, 2026 Closed
- Date posted
- Jul 22, 2026
- Source
- Open notice
Description
NOTE: The USCG is NOT accepting any more RFIs/Questions as of Weds, 22Jul2026. The Due Date has been extended to no later than 01:00 PM PST on Friday, August 7, 2026. As of Weds, 22Jul 2026, two (2) IFB Amendments has been posted & both must be completed/returned with your bid. Please carefully review them. INVITATION FOR BID (IFB) No: 70Z08826B0000123, FY26 REPAIR & REPLACE ATON AT THE U.S. COAST GUARD (USCG), BASE TONGUE POINT/COLUMBIA RIVER; ASTORIA, OR; PSN 20041934 Z2BC - REPAIR OR ALTERATION OF RADAR AND NAVIGATIONAL FACILITIES 237990 - Other Heavy and Civil Engineering Construction BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. Project Description: In accordance with attached Specifications dated/approved 08Apr2026. (Subject to change at the discretion of the Government). Contractor shall provide all necessary supervision, labor, materials, equipment, power, and personnel to accomplish work installing, replacing, and/or removing ATON structures in the Columbia River Area/U.S. Coast Guard (USCG) Base Tongue Point, located at Astoria, Oregon. Work includes, but is not limited to: Standard ATON Maintenance work which includes removals, replacements, and repairs of damaged ATON structures. See appendix A, appendix B, and attached Specifications for scope requirements. ATON structure fabrication. Surveying of completed range structures to ensure proper positioning. Structures will be constructed within in-water work window limitations. The Columbia River in-water work window for this project is November 01, 2026 thru February 28, 2027. ALL In-Water work must be completed by February 28, 2027.The procurement estimate is between $1,000,000.00 and $5,000,000.00. The NAICS for this project is 237990. This requirement is issued as an Invitation for Bid (IFB) which will result in the award of a single Firm Fixed Price (FFP) Contract. Please carefully review all attachments. Request for Clarification can be submitted to BOTH Vincent Yee at vincent.yee@uscg.mil AND Guiljohn Alcantara at guiljohn.alcantara@uscg.mil Request for Clarification should be submitted using form provided, Appendix F. Submitted BIDs must include the following information: One (1) completed copy of the SF 1442 (Appendix A) Signed copies of all amendments, if applicable. IFB-Section B, schedule of Prices IFB- Section K, Reps and Certs (note IFB highlighted sections) IFB- Section L, Bid Bond (Standard Form 24) IFB- Section K.8 (if applicable)- Certification of Authority to Bind Corporation. Bids shall be up-loaded via DOD Safe from July 20, 2026 thru July 31, 2026. Instructions are in the IFB Document. Early Bid submittals are highly encouraged. *Please do not call to inquire about the status of your bid, as this information will not be released.
Classifications
Documents (14)
- APPENDIX E Wage Determination OR20260063 dated 18May25.pdf.pdf85 KBNot yet available
- APPENDIX I-Contractor Responsibility.pdf.pdf32 KBNot yet available
- APPENDIX F- Sample Survey.pdf.pdf4.3 MBNot yet available
- APPENDIX D-Marine Mammal Monitoring Plan.pdf.pdf404 KBNot yet available
- APPENDIX G-GFM List.pdf.pdf140 KBNot yet available
- IFB_70Z08826B0000123-REPAIR REPLACE ATON COL RIVER-ASTORIA OR_R1-22Jul26.pdf.pdf1.4 MBNot yet available
- APPENDIX J-Clarification Request Form.docx.docx28 KBNot yet available
- Amendment 01 - IFB_70Z08826B0000123-REPAIR REPLACE ATON COL RIVER-ASTORIA OR.pdf.pdf370 KBNot yet available
- APPENDIX B-Replace ATON-SPECIFICATIONS_08Apr26.pdf.pdf3.9 MBNot yet available
- APPENDIX H- Inadvertent Discovery Plan.pdf.pdf1.6 MBNot yet available
- APPENDIX C-Replace ATON-DRAWINGS.pdf.pdf5.1 MBNot yet available
- Amendment 02 - IFB_70Z08826B0000123-REPAIR REPLACE ATON COL RIVER-ASTORIA OR.pdf.pdf207 KBNot yet available
- APPENDIX A-SF1442-ATON ASTORIA_B0000123.pdf.pdf840 KBNot yet available
- APPENDIX K CERT OF AUTHORIZATION TO BIND CORPORATION FAR 4.pdf.pdf387 KBNot yet available
Contacts
- vincent.yee@uscg.mil5716071076
- guiljohn.alcantara@uscg.mil5102211028
Similar contracts
- FY26 MOTSU BermsDue Aug 24, 2026
- TIMPAS PICNIC AREA SITE IMPROVEMENT PROJECTColoradoDue Aug 25, 2026
- Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MDDue Sep 1, 2026
- RICHMOND INNER HARBOR FY26 MAINTENANCE DREDGING PROJECT Due Aug 28, 2026
- Calcasieu River and Pass, LA, Dredged Material Management Plan (DMMP), CDF-12A Degrading, Calcasieu Parish, LALouisianaDue Aug 21, 2026
- Thomas J. O Brien (TJO) Embankment RepairDue Sep 14, 2026