John Day Fish Pump Rehabilitation
- Response deadline
- May 20, 2026 Closed
- Date posted
- May 1, 2026
- Source
- Open notice
Description
W9127N26BA001 Amendment 0003 posted 1 May 2026 W9127N26BA001 Amendment 0002 posted 22 April 2026 W9127N26BA001 Amendment 0001 posted 9 April 2026 --------------------------------------------------- The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract. Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3. Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications. The following information represents the project objectives: Removal and replacement of damaged pump shafts and bearings. Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox. Precision machining (true-up) of shafts, bearing housings, and diffuser components. Installation of greaseless bearing liners and replacement of stainless-steel bearing journals. On-site reassembly, shaft alignment, gearbox installation, and system balancing. Testing of the completed pump unit(s) to verify functional performance. Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Classifications
Documents (13)
- DownloadW9127N26BA001 Amendment 0001 SF 30.pdf.pdf3.9 MB
- DownloadSpecifications - John Day Fish Pumps Appendix A - Work Space Access Trailer and Parking Locations.pdf.pdf6.0 MB
- DownloadWater Piping and Secondary Access Point FIO drawings.zip.zip1.3 MB
- DownloadPropeller_Condition.zip.zip10.3 MB
- DownloadAMD0002_Technical Sections.pdf.pdf194 KB
- DownloadJD-63-391-50.pdf.pdf186 KB
- DownloadW9127N26BA001 Solicitation JDFPER25.pdf.pdf8.0 MB
- DownloadW9127N26BA001 Amendment 0002 SF 30.pdf.pdf3.9 MB
- DownloadODJ Fish Pumps Rehabilitation FOR REFERENCE ONLY DRAWINGS.pdf.pdf4.9 MB
- DownloadJDD So Fish U-3_O and M Manual.pdf.pdf12.3 MB
- DownloadODJ Fish Pumps Rehabilitation FOR REFERENCE ONLY DRAWINGS_BCOES_SAM_rev002.pdf.pdf7.1 MB
- DownloadW9127N26BA001 Amendment 0003 SF 30.pdf.pdf1.4 MB
- DownloadPump_Access.zip.zip48.0 MB
Contacts
Similar contracts
- LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)LouisianaDue Oct 27, 2026
- Industry Day - Selma AL Flood Management Risk and BankAlabamaDue Oct 28, 2026
- Section 219 Chesterton Interceptor Rehab
- Camp Wooten/Starbuck Levee RehabWashingtonDue Oct 30, 2026
- Sources Sought: Liberty State Park Ecosystem Restoration Project, Jersey City, NJNew JerseyDue Oct 30, 2026
- Sources Sought Wood River Relief Wells ConstructionDue Oct 28, 2026