or_oregonbuysS-KA0010-00017932
Open
Ashland Wastewater Treatment Plant Headworks Upgrade
- Response deadline
- Oct 8, 2026 Due in 28 days
- Date posted
- —
- Source
- Open notice
Description
Sealed Bids for construction of Ashland Wastewater Treatment Plant Headworks Upgrade. The Project consists of wastewater treatment headworks improvements and includes two new influent screens with associated washer/compactors, a new downstream stacked tray grit removal facility with grit separation and grit slurry pumping equipment, grit classifier, and integral flow splitting to the downstream oxidation ditch aeration basins. Work also included, associated yard piping, electrical and Controls.
Classifications
- NAICS913
Documents (3)
- Ashland WWTP Headworks Upgrade -Specs - Final.pdfapplication/octet-stream;charset=UTF-84.0 MBNot yet available
- Ashland WWTP Headworks Upgrade - Stamped_Drawings.pdfapplication/octet-stream;charset=UTF-836.4 MBNot yet available
- Ashland WWTP Headworks Upgrade - Geotechnical Engineering Report_STAMPED.pdfapplication/octet-stream;charset=UTF-84.2 MBNot yet available
Contacts
Similar contracts
- OAAA, 2010, Zulu Sign Project Buckley AASFCODue Aug 25, 2026
- OAAA, 2010, Zulu Sign Project Buckley AASFCODue Aug 25, 2026
- RFB PCC Enrollment Center RemodelCODue Jul 14, 2026
- Mill and Repave Bolen BoulevardILDue Sep 15, 2023
- 911 Tower Inspection HKILDue Jun 29, 2026
- DMH IFB PMHC Campus RoadworkILDue Apr 22, 2025