OLYM - FAIRHOLME CG ABAAS IMPROVEMENTS
- Response deadline
- Aug 18, 2026 Due in 31 days
- Date posted
- Jul 16, 2026
- Source
- Open notice
Description
The National Park Service (NPS) Olympic National Park (OLYM) in Clallam County, Washington, has a requirement to make ABAAS improvements and construct family restroom foundations at Fairholme Campground. 1. The work of this contract consists of constructing: a.) 12'x12' foundation, floor slab, retaining wall, and apron/sidewalks for Loop A comfort station. Stairs, ABAAS ramp, and handrails on the Loop A comfort station. b.) 12'x12' foundation, floor slab, and comfort station apron/sidewalks for the Loop B Comfort Station. c.) Make necessary rough in utility connections for family restroom foundations. d.) New or improved ABAAS trails connecting sites 3,4,16,45,69 including crosswalk for site 16. e.) ABAAS improvements to campsites 3,4,16,45,69. f.) Remove, Repair, and Reinstall signboards at comfort station Loop A and Loop B. 2. Option Items May include: a. Construct ABAAS crosswalk and trail connecting campsite 3 to Loop A comfort station trail. Asphalt pave parking areas for campsites 3 and 4. b. Construct ABAAS crosswalk and trail connecting campsite 69 to Loop B comfort station trail. Asphalt pave parking areas for campsites 45 and 69.
Classifications
Documents (15)
- B08_Attachment_11_52_222-38_Response_Form_-_Copy.pdf.pdf138 KBNot yet available
- B08_Attachment_09_Past_Performance_Questionnaire_-_Copy.docx.docx47 KBNot yet available
- B08_Attachment_07_Project_Experience_Questionnaire_-_Copy_(2).docx.docx40 KBNot yet available
- B08_Attachment_08_Key_Personnel_Experience_-_Copy.docx.docx23 KBNot yet available
- B08_Attachment_02_Existing_Condition_Photos_-_Copy.pdf.pdf3.9 MBNot yet available
- B08_Attachment_06_Proposal_Submission_Package_Cover_Page_and_Table_of_Contents.pdf.pdf105 KBNot yet available
- B08_Attachment_10_52_209-13_Response_Form_-_Copy.pdf.pdf178 KBNot yet available
- B08_Attachment_14_Standard_Form_24__Bid_Bond_-_Copy_-_Copy.pdf.pdf720 KBNot yet available
- B08_Attachment_01_Specifications_SOW_Fairholme_CG_ABAAS_Improvements_-_Copy.pdf.pdf361 KBNot yet available
- B08_Attachment_04_Construction_Wage_Determination_SAM_-_Copy.pdf.pdf200 KBNot yet available
- B08_Attachment_03_Fairholme_Campground_ABAAS_Improvements_and_Family_Restroom_Foundations_Drawings_-_Copy.pdf.pdf7.9 MBNot yet available
- B08_Attachment_12_General_References_-_Copy_(2).pdf.pdf104 KBNot yet available
- B08_Attachment_05_Price_Schedule_and_Forms_to_Submit_with_Proposal_-_Copy.pdf.pdf441 KBNot yet available
- Sol_140P8326R0006.pdf.pdf840 KBNot yet available
- B08_Attachment_13_Subcontracting_Percentage_Worksheet_-_Copy_-_Copy.xlsx.xlsx89 KBNot yet available
Contacts
- Chisolm, Marzjelemickey_chisolm@ios.doi.gov3605653025